MahaRERA Application

General Information

Other Than Individual

Organization

Jagtap Patil Promoters & Builders
Partnership
NA
Do you have any Past Experience ?
Yes

Address Details

Sr. No. 24
Engracia
60 Feet Road
Pimple Gurav
Near Ram Krishna Mangal Karyalay
MAHARASHTRA
Pune
Pune
Haveli
Pimpale Gurav
411061

Organization Contact Details

02027261992
www.jagtappatil.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Sai LaurelResidentialNA7791.42S No 47 Dnyanesh Park Krishna Chowk Pimple Gurav 411061S No 4741802012-03-302012-03-30

Member Information

Member Name Designation Photo
Jaysingh Appasaheb Jagtap Authorized Signatory View Photo
Vijay Pandurang Jagtap Partner View Photo
Rajendra Appasaheb Jagtap Partner View Photo
Shobha Ramdas Jagtap Partner View Photo
Shankar Pandurang Jagtap Authorized Signatory View Photo

Project

Engracia
On-Going Project
31/12/2019
31/12/2019
No
Residential
No
Survey No. 24
By 18 mtr Wide D P Road
By 18 mtr Wide D P Road
By S No 23 property of Mr Nawale
By S No 25 property of Mr Kadam
MAHARASHTRA
Pune
Pune
Haveli
Pimpale Gurav
411061
6300.99
2
2
0
775.66

FSI Details

0
10076
10076

Bank Details

Punjab National Bank
PUNB0055400

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 75 36 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 TRIMIX ROAD & PAVER BLOCK
Water Conservation, Rain water Harvesting : YES 100 AS PER REQUIREMENT OF PCMC
Energy management : YES 100 SOLAR WATER HEATING
Fire Protection And Fire Safety Requirements : YES 100 AS PER PCMC RULES
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 AS PER MSEDCL RULES
Aggregate area of recreational Open Space : YES 100 775.66 SQMTS
Open Parking : YES 100 AS PER SANCTIONED DRAWING
Water Supply : YES 100 AS PER REQUIREMENT OF PCMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 AS PER REQUIREMENT OF PCMC
Storm Water Drains : YES 100 AS PER REQUIREMENT OF PCMC
Landscaping & Tree Planting : YES 100 AS PER STATUTORY REQUIREMENT
Street Lighting : YES 100 WILL BE PROVIDED ALONG INTERNAL ROAD
Community Buildings : YES 100 CLUB HOUSE
Treatment And Disposal Of Sewage And Sullage Water : YES 100 TREATED IN STP AND RECYCLED FOR FLUSHING
Solid Waste Management And Disposal : YES 100 GARBAGE CHUTE

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Engracia B 31/12/2019 0 1 1 10 1 6 29
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 36.32 4 0
2 2BHK.TYPE1 50.08 7 7
3 2BHK.TYPE2 49.18 8 8
4 2BHK.TYPE3 48.02 8 8
5 2BHK.TYPE4 47.49 8 8
6 2BHK.TYPE6 48.43 2 0
7 2BHK.TYPE7 47.14 2 0
8 2BHK.TYPE8 46.60 2 0
9 2BHK 49.29 2 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Engracia C 31/12/2019 0 1 1 10 1 2 46
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK.TYPE3 44.52 4 0
2 2BHK.TYPE5 47.95 3 0
3 2BHK.TYPE4 47.18 3 2
4 2BHK.TYPE12 43.38 2 0
5 2BHK.TYPE17 43.91 2 0
6 2BHK.TYPE19 48.56 2 0
7 2BHK.TYPE10 36.78 1 0
8 2BHK.TYPE11 47.81 2 0
9 1BHK 37.03 2 0
10 2BHK.TYPE2 43.88 8 7
11 2BHK 44.22 1 1
12 2BHK.TYPE7 44.73 8 6
13 2BHK 45.36 7 4
14 2BHK 46.65 3 3
15 2BHK 46.80 1 1
16 2BHK 47.60 9 9
17 2BHK 47.67 1 1
18 2BHK 48.45 2 2
19 2BHK 49.15 8 4
20 2BHK 49.62 6 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Mr Shashank Phadke NA Architect
Mr G A Bhilare NA Engineer
Salil Karkhanis NA Other Professional

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Architect’s Certificate on Completion of Project (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other