MahaRERA Application

General Information

Other Than Individual

Organization

Heena Lifestyles
Partnership
NA
Do you have any Past Experience ?
No

Address Details

A/5
viral apt.,
S.V. ROAD
ANDHERI (W)
OPP. SHOPPERS STOP
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400058

Organization Contact Details

02226707123
www.heenagroup.com

Past Experience Details

Member Information

Member Name Designation Photo
Deepak Himatlal Shah Partner View Photo
Mihir DEEPAK SHAH Authorized Signatory View Photo

Project

GOKUL VAIBHAV
On-Going Project
28/02/2018
31/03/2019
30/03/2020
No
Residential
No
1041-B DAHISAR
1033-B
1041-A
1040
1041-C
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
BHARUCHA ROAD
DAHISAR EAST
400068
1603.20
1
1
0
247.25

FSI Details

1107
3221
4328.00

Bank Details

AXIS BANK
UTIB0000124

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 68 15 70

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 BY DEVELOPER AS PER CONSULTANTS DESIGN
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 BY DEVELOPER AS PER C.F.O NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 BY DEVELOPER
Aggregate area of recreational Open Space : YES 0 PAVED R.G AS PER MCGM DC RULES
Open Parking : YES 0 BY DEVELOPER
Water Supply : YES 0 BY M.C.GM
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 80 BY DEVELOPER
Storm Water Drains : YES 0 BY DEVELOPER AS PER MCGM REMARKS
Landscaping & Tree Planting : YES 0 BY DEVELOPER AS PER REMARKS BY TREE AUTHORITY
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 GOKUL VAIBHAV Gokul Vaibhav 0 1 0 10 1 8 68
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 62.14 5 5
2 2 BHK 66.04 4 2
3 1BHK 40.41 8 5
4 3BHK 78.43 4 3
5 3BHK 82.92 4 4
6 2BHK 56.37 1 1
7 2BHK 63.24 1 1
8 1BHK 35.80 4 3
9 1BHK 36.90 1 0
10 1BHK 39.51 4 2
11 1BHK 36.41 9 6
12 1BHK 34.25 7 4
13 1BHK 35 2 2
14 1BHK 39.20 8 0
15 1BHK 51.81 1 1
16 1BHK 32.16 2 2
17 1BHK 35.87 7 6
18 2BHK 50.62 2 2
19 2BHK 55.28 7 7
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 50
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 35
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 44
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 42.9

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
MR MANISH MANHARLAL SHAH NA Architect
Vatsal Harshad Gokani NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity
Status of Formation of Legal Entity
Status of Conveyance
Other