MahaRERA Application

General Information

Other Than Individual

Organization

ZAMBAD DISHA PRIDE INFRASTRUCTURES LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

OFFICE NO 101 TO 104
SAI TRADE CENTRE
STATION ROAD
STATION ROAD
OPP RAILWAY STATION
MAHARASHTRA
Aurangabad
Aurangabad
Aurangabad
Aurangabad (M Corp.)
431005

Organization Contact Details

02402345016

Past Experience Details

Member Information

Member Name Designation Photo
SUBHASH MANAKHCHAND ZAMBAD Partner View Photo
SANDESH SUBHASH ZAMBAD Partner View Photo
NITIN VENUPRASAD BAGADIA Partner View Photo
DEVANAND NARAYAN KOTGIRE Partner View Photo
NAVIN HANUMANPRASAD BAGADIA Partner View Photo
NAVIN HANUMANPRASAD BAGDIYA Authorized Signatory View Photo

Project

32 FREEDOM PARK SOUTHREPUBLIC
On-Going Project
31/12/2019
31/12/2019
No
Residential
No
PLOT NO 483 TO 487 AND 506TO 512 GUT NO 308
9 MTR ROAD
9 MTR ROAD
PLOT NO 488 AND 505
PLOT NO 481-482 AND 12 MTR ROAD
MAHARASHTRA
Aurangabad
Aurangabad
Aurangabad
Satara (CT)
431005
566.23
3
3
0
0

FSI Details

0
600.02
600.02

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 9 0 60

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 BT TOP ROAD
Water Supply : YES 0 FROM COMMON WELL AT SITE
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 PRECAST SEPTIC TANK FOR ROW HOUSES NOT YET STATRED
Storm Water Drains : YES 80 NATURAL STREAMS AVAILABLE
Landscaping & Tree Planting : YES 0 TREE PLANTATION COMPLETED AROUND THE ROW HOUSES
Street Lighting : YES 100 LED AND CFL STREET LIGHT ON G I POLS
Electrical Meter Room, Sub-Station, Receiving Station : YES 20 100 KV TRANSFORMER ERECTED AT SITE
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Community Buildings : YES 0 PROPOSED FOR SOUTH REPUBLIC PROJ. AVAILABLE
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA
Water Conservation, Rain water Harvesting : YES 30 WORK IN PROGRESS
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 32 FREEDOM PARK SOUTHREPUBLIC RH 2 BHK 31/12/2019 0 1 0 3 0 0 3
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RH 2 BHK 55.05 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 32 FREEDOM PARK SOUTHREPUBLIC RH 2 BHK 31/12/2019 0 1 0 3 0 0 6
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RH 2 BHK 59.07 2 0
2 RH 2 BHK 55.05 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 50
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 36
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 32 FREEDOM PARK SOUTHREPUBLIC RH 1 BHK 31/12/2019 0 1 0 2 0 1 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RH 1 BHK 38.78 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
STAR INFRASTRUCTURE NA Contractor
ADVANTAGE ARCHITECTURE NA Architect
CORE CONSULTANTS NA Structural Engineer
SHAILESH SURYAVANSHI NA Other
RANJANE NA Other

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Proforma of the allotment letter and agreement for sale
Declaration in FORM B
Building Plan Approval (IOD)
Commencement Certificates
Status of Conveyance
Certificates of Architect (Form 4)
Other
Certificates of CA (Form 5)
Status of Formation of Legal Entity (Society/Co Op etc.)