MahaRERA Application

General Information

Other Than Individual

Organization

RDP Realtores
Partnership
NA
Do you have any Past Experience ?
No

Address Details

Survey No. 58,
H No.1 B,2,3
Padle Village
Kalyan Shilfata Road
Near Toyota Showroom
MAHARASHTRA
Konkan
Thane
Murbad
Padale
421204

Organization Contact Details

02265646599

Past Experience Details

Member Information

Member Name Designation Photo
Dilip Yadav Partner View Photo
Suresh Bhanushali Partner View Photo
Premkumar Gangwani Partner View Photo
Jitesh Mange Partner View Photo
Dilip Lallan Yadav Authorized Signatory View Photo
Mitesh Vedprakash Sugla Partner View Photo
RDP MERA GHAR LUXURIA PRIVATE LIMITED through its Director Mitesh Vedprakash Sugla Partner View Photo

Project

Shanti Luxuria
On-Going Project
31/12/2021
31/12/2021
31/12/2021
No
Others
Yes
Survey No 58 /Hissa No 2
Adjoining Survey No 59
Adjoining Survey No58 1 part
D P Road
Survey No 57
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
Murbad
Padale
410203
7900
1
1
0
1629.28

FSI Details

3909.22
9018.54
12927.76

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement Office Number Other Details
Shanti Luxuria Ramdas Mhatre Individual Area Share NA Address : 1 ,0 ,Padle ,Padle ,Padle ,Division :Konkan ,District :Thane ,Taluka :Murbad ,Village :Padale ,410203 ,27

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Driveway proposed
Water Supply : YES 0 Will provide upto site by TMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Septic tank proposed
Storm Water Drains : YES 0 Will be connected to storm water nala
Landscaping & Tree Planting : YES 0 RG & Adequate Number of tress shall be planted
Street Lighting : YES 0 Compound lighting proposed
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Electrical meter
Aggregate area of recreational Open Space : YES 0 sub station set proposed
Open Parking : YES 0 1629.28 sq. mtrs.
Swimming Pool : YES 70 Proposed at 1st Podium
Gymnasium : YES 0 Fitness Center at 1st Floor
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Septic tank proposed
Solid Waste Management And Disposal : YES 0 Site disposal will be provided by TMC
Water Conservation, Rain water Harvesting : YES 0 Shall be provided by TMC
Energy management : YES 0 rain water harvesting shall be provided by TMC
Fire Protection And Fire Safety Requirements : YES 0 Will be provided as per provisional fire NOC

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Shanti Luxuria Shanti Luxuria 0 1 1 23 0 216 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 85.87 1 0
2 Shop 90.54 1 0
3 Shop 208.80 1 0
4 Shop 108.89 1 0
5 Residential 32.58 44 38
6 Residential 33.86 44 34
7 Residential 42.8 86 46
8 Shop 110.60 1 1
9 Shop 159.25 1 1
10 Residential 51.74 42 12
11 Shop 70.91 1 1
12 Shop 90.18 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 5
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 30.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Valency Realty Pvt. ltd. A51900003909 Real Estate Agent
The Firm NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Declaration in FORM B
Commencement Certificates
Building Plan Approval (IOD)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Details of encumbrances
Declaration in FORM B
Details of encumbrances
Declaration in FORM B
Status of Conveyance
Certificates of Architect (Form 4)
Other
Certificates of CA (Form 5)
Status of Formation of Legal Entity (Society/Co Op etc.)