MahaRERA Application

General Information

Other Than Individual

Organization

KARDA CONSTRUCTIONS LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

2ND FLOOR
GULMOHAR STATUS
DR MUNJE ROAD
SAMARTH NAGAR
ABOVE BUSINESS BANK
MAHARASHTRA
Nashik
Nashik
Nashik
Nashik
422005

Organization Contact Details

02532465436
www.kardaconstrutcion.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Hari Sankul Phase IResidentialNA5600Near Ashoka Universal School behind Fame Multiplex Ashoka Marg Nashik 422006S No 860/1/33932011-12-252012-05-29
2Hari Aangan Phase IResidentialNA1350Jachak Mala Jay Bhavani road DeolaliS No 53/5 D1242013-04-022013-05-07
3Hari Vandan Phase IIResidentialNA2340Near Aarambh Maha Vidyalaya Sane Guruji Nagar Jail road Nashik422101S No 119/A/119B/4/21282012-08-162012-10-31
4Hari NiwasOthersCommercial & Residencial2340Behind Muktidham near hotel Orange tree Datta Mandir Nashik road Nashik 422101S NO 9/1 to 18/15 ,9/1 to 18/163932011-07-202011-09-06
5Hari Sneh IResidentialNA2620.73Behind Ashoka Universal school near I T Park Nashik 422011S No 3/2C/2/B Plot No 1,2,3,41502012-08-102012-09-04
6Hari Sneh Phase IIResidentialNA1572.04Behind Ashoka Universal school near I T Park Nashik 422011S No 3/2C/2/B Plot No 5,6,83502015-05-202015-06-01
7Hari ShrushtiResidentialNA1572.04Opp IT Park Wadala road Indira Nagar Nashik 422214S No 110/5B/2/1,2,3,43502015-07-312015-08-15
8Hari SparshResidentialNA8000Barnes School road Deolali Camp Nashik 422502S No 305/1A/2B/1 and S No 305/1A/2B/28762014-05-012014-04-28
9Hari Om Phase IResidentialNA8800Near Guru Govind Singh Polytechnic College Indira Nagar Nashik 422009S No 97 Plot No 1,252162013-10-012013-11-16
10Hari SankalpResidentialNA3153.73Near Serene Medows Gnagapur road Nashik 422013S No 41/1/1,2,3,4,5,62372012-10-202012-11-05
11Hari AmrutResidentialNA2383.3Lokhande Mala Old Saikheda road Jail road Nashik 42221442/2-33692014-07-052014-07-21
12Hari KunjResidentialNA1646.73Jai Bhavani road Nashik roadS No 52/6,8 Plot No 2,31362012-09-302012-10-31

Member Information

Member Name Designation Photo
Naresh Jagumal Karda Partner View Photo
NARESH JAGUMAL KARDA Authorized Signatory View Photo

Project

HARI OM PHASE II
On-Going Project
30/06/2020
30/06/2020
No
Residential
No
S NO 97/4, 97/5
18 MTRS WIDE PROPOSED DP ROAD
ADJ H NO 03
9 MTRS WIDE ROAD AND ADJ S NO 101
9 MTRS WIDE ROAD AND ADJ H NO 07
MAHARASHTRA
Nashik
Nashik
Nashik
Nashik
Indira Nagar
Indira Nagar
422006
8100
3
3
0
768.75

FSI Details

0
9474.04
9474.04

Bank Details

ICICI BANK LIMITED
ICIC0000182

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 PAVER BLOCKS
Water Conservation, Rain water Harvesting : YES 0 RECHARGE PIT WITH BOREWELL
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 AS PER PROVISIONAL NOC
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : YES 0 AS PER APPROVED BUILDING PLAN
Open Parking : YES 0 AS PER APPROVED BUILDING PLAN
Water Supply : YES 0 TO BE OBTAINED FROM NASHIK MUNICIPAL CORPORATION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 SEPTIC TANK WITH SOAK PIT
Storm Water Drains : YES 0 AS PER APPROVED BUILDING PLAN
Landscaping & Tree Planting : YES 0 AS PER APPROVED BUILDING PLAN
Street Lighting : YES 0 AS PER APPROVED BUILDING PLAN
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 STP OF CAPACITY 135
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 HARI OM PHASE II WING A 30/06/2020 0 1 0 12 1 39 44
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK.A.105 36.40 1 1
2 2BHK.A.106 50.67 1 0
3 2BHK.A.107 49.12 1 0
4 1BHK.A.605 36.40 1 0
5 2BHK.A.606 50.92 1 1
6 2BHK.A.607 49.75 1 0
7 1BHK.A.608 38.45 1 0
8 2BHK.A.701 49.46 1 0
9 2BHK.A.702 49.16 1 0
10 1BHK.A.703 39.10 1 1
11 2BHK.A.704 50.41 1 1
12 1BHK.A.108 37.73 1 0
13 2BHK.A.201 49.46 1 0
14 2BHK.A.202 49.16 1 0
15 1BHK.A.203 39.10 1 0
16 2BHK.A.206 50.92 1 0
17 2BHK.A.207 49.75 1 0
18 2BHK.A.101 48.70 1 0
19 2BHK.A.102 48.70 1 0
20 1BHK.A.103 38.38 1 0
21 2BHK.A.104 149.06 1 0
22 1BHK.A.208 38.45 1 1
23 2BHK.A.301 49.46 1 1
24 2BHK.A.302 49.16 1 0
25 1BHK.A.303 39.10 1 1
26 2BHK.A.304 50.41 1 0
27 1BHK.A.305 36.40 1 0
28 2BHK.A.306 50.92 1 0
29 2BHK.A.307 49.75 1 1
30 1BHK.A.308 38.45 1 0
31 1BHK.A.308 38.45 1 0
32 2BHK.A.401 49.46 1 0
33 2BHK.A.402 49.16 1 0
34 1BHK.A.403 39.10 1 0
35 2BHK.A.404 50.39 1 0
36 1BHK.A.405 36.40 1 1
37 2BHK.A.406 50.92 1 1
38 2BHK.A.407 49.75 1 1
39 1BHK.A.408 38.45 1 1
40 2BHK.A.501 49.46 1 1
41 2BHK.A.502 49.16 1 1
42 1BHK.A.503 39.10 1 0
43 2BHK.A.504 50.41 1 1
44 1BHK.A.505 36.40 1 0
45 2BHK.A.506 50.92 1 0
46 2BHK.A.507 49.75 1 0
47 1BHK.A.508 38.45 1 0
48 2BHK.A.601 49.46 1 1
49 1BHK.A.602 49.16 1 0
50 1BHK.A.603 39.10 1 0
51 2BHK.A.604 50.39 1 0
52 1BHK.A.705 36.40 1 0
53 2BHK.A.706 50.92 1 0
54 2BHK.A.707 49.75 1 1
55 1BHK.A.708 38.45 1 1
56 2BHK.A.801 49.46 1 0
57 2BHK.A.802 49.16 1 0
58 1BHK.A.803 39.10 1 0
59 2BHK.A.804 50.39 1 0
60 2BHK.A.804 50.39 1 0
61 1BHK.A.805 36.40 1 0
62 2BHK.A.806 50.92 1 0
63 2BHK.A.807 49.75 1 0
64 1BHK.A.808 38.45 1 0
65 2BHK.A.901 49.46 1 1
66 2BHK.A.902 49.16 1 0
67 1BHK.A.903 39.10 1 0
68 2BHK.A.904 50.41 1 0
69 1BHK.A.905 36.40 1 0
70 2BHK.A.906 50.92 1 0
71 2BHK.A.907 49.75 1 0
72 1BHK.A.908 38.45 1 0
73 2BHK.A.1001 49.46 1 0
74 2BHK.A.1002 49.16 1 0
75 1BHK.A.1003 39.10 1 0
76 2BHK.A.1004 50.39 1 0
77 1BHK.A.1005 36.40 1 0
78 2BHK.A.1006 50.92 1 0
79 2BHK.A.1007 49.75 1 0
80 1BHK.A.1008 38.45 1 0
81 2BHK.A.1101 49.46 1 0
82 2BHK.A.1102 49.16 1 0
83 1BHK.A.1103 39.10 1 0
84 2BHK.A.1104 50.41 1 0
85 1BHK.A.1105 36.40 1 0
86 2BHK.A.1106 50.92 1 0
87 2BHK.A.1107 49.75 1 0
88 1BHK.A.1108 38.45 1 0
89 2BHK.A.1201 49.46 1 0
90 2BHK.A.1202 49.16 1 0
91 1BHK.A.1203 39.10 1 0
92 2BHK.A.1204 50.39 1 0
93 1BHK.A.1205 36.04 1 0
94 2BHK.A.1206 50.92 1 0
95 2BHK.A.1207 49.75 1 0
96 1BHK.A.1208 38.45 1 0
97 2BHK.A.204 50.39 1 0
98 1BHK.A.205 36.40 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 60
5 X number of Slabs of Super Structure 75
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

50
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 15
11 Overall Percentage of Completion of the work done For the entire Building /Wing 46
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 HARI OM PHASE II WING B 30/06/2020 0 1 1 12 1 7 34
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK.B.602 50.34 1 0
2 2BHK.B.603 50.37 1 0
3 2BHK.B.701 50.19 1 0
4 2BHK.B.702 50.34 1 0
5 2BHK.B.703 50.37 1 0
6 2BHK.B.704 50.22 1 0
7 2BHK.B.801 50.19 1 0
8 2BHK.B.101 49.67 1 0
9 2BHK.B.102 50.34 1 0
10 2BHK.B.104 49.28 1 0
11 2BHK.B.202 50.34 1 0
12 2BHK.B.203 50.37 1 0
13 2BHK.B.204 50.22 1 0
14 2BHK.B.301 50.19 1 0
15 2BHK.B.302 50.34 1 0
16 2BHK.B.303 50.37 1 0
17 2BHK.B.304 50.22 1 0
18 2BHK.B.402 50.34 1 0
19 2BHK.B.403 50.37 1 0
20 2BHK.B.501 50.19 1 0
21 2BHK.B.502 50.34 1 0
22 2BHK.B.503 50.37 1 0
23 2BHK.B.504 50.22 1 0
24 2BHK.B.802 50.34 1 0
25 2BHK.B.803 50.37 1 0
26 2BHK.B.901 50.19 1 0
27 2BHK.B.902 50.34 1 0
28 2BHK.B.903 50.37 1 0
29 2BHK.B.904 50.22 1 0
30 2BHK.B.1001 50.19 1 0
31 2BHK.B.1002 50.34 1 0
32 2BHK.B.1003 50.37 1 0
33 2BHK.B.1004 50.22 1 0
34 2BHK.B.1101 50.19 1 0
35 2BHK.B.1102 50.34 1 0
36 2BHK.B.1103 50.37 1 0
37 2BHK.B.1104 50.22 1 0
38 2BHK.B.1201 50.19 1 0
39 2BHK.B.1202 50.34 1 0
40 2BHK.B.1203 50.37 1 0
41 2BHK.B.1204 50.22 1 0
42 2BHK.B.103 49.64 1 0
43 2BHK.B.201 50.19 1 1
44 2BHK.B.401 50.19 1 1
45 2BHK.B.404 50.22 1 1
46 2BHK.B.601 50.19 1 1
47 2BHK.B.604 50.22 1 1
48 2BHK.B.804 50.22 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 70
4 Stilt Floor 60
5 X number of Slabs of Super Structure 75
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

30
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 50.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 HARI OM PHASE II WING C 30/06/2020 0 1 0 12 1 35 42
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK.C.404 39.06 1 1
2 3BHK.C.406 65.43 1 1
3 2BHK.C.501 50.22 1 1
4 2BHK.C.503 50.97 1 1
5 1BHK.C.504 39.06 1 1
6 3BHK.C.506 65.43 1 1
7 2BHK.C.603 50.97 1 1
8 1BHK.C.604 39.06 1 1
9 2BHK.C.701 50.22 1 1
10 2BHK.C.703 50.97 1 1
11 1BHK.C.704 39.06 1 1
12 3BHK.C.706 65.43 1 1
13 2BHK.C.101 49.19 1 0
14 2BHK.C.102 50.31 1 0
15 2BHK.C.103 50.23 1 0
16 1BHK.C.104 38.61 1 0
17 3BHK.C.105 65.05 1 0
18 2BHK.C.201 49.87 1 0
19 2BHK.C.202 51.04 1 0
20 3BHK.C.205 65.41 1 0
21 2BHK.C.302 51.04 1 0
22 1BHK.C.304 39.06 1 0
23 3BHK.C.305 65.43 1 0
24 3BHK.C.306 65.43 1 0
25 2BHK.C.402 51.04 1 0
26 3BHK.C.405 65.41 1 0
27 2BHK.C.502 51.04 1 0
28 3BHK.C.505 65.43 1 0
29 2BHK.C.601 49.87 1 0
30 2BHK.C.602 51.04 1 0
31 3BHK.C.605 65.41 1 0
32 3BHK.C.606 65.43 1 0
33 2BHK.C.702 51.04 1 0
34 3BHK.C.705 65.43 1 0
35 2BHK.C.801 49.87 1 0
36 2BHK.C.802 51.04 1 0
37 2BHK.C.803 50.97 1 0
38 1BHK.C.804 39.06 1 0
39 3BHK.C.805 65.41 1 0
40 3BHK.C.806 65.43 1 0
41 2BHK.C.901 50.22 1 0
42 2BHK.C.902 51.04 1 0
43 2BHK.C.903 50.97 1 0
44 1BHK.C.904 39.06 1 0
45 3BHK.C.905 65.43 1 0
46 3BHK.C.906 65.43 1 0
47 2BHK.C.1001 50.22 1 0
48 2BHK.C.1002 51.04 1 0
49 2BH.C.1003 50.97 1 0
50 1BHK.C.1004 39.06 1 0
51 3BHK.C.1005 65.41 1 0
52 3BHK.C.1006 65.43 1 0
53 2BHK.C.1101 50.22 1 0
54 2BHK.C.1102 51.04 1 0
55 2BHK.C.1103 50.97 1 0
56 1BHK.C.1104 39.06 1 0
57 3BHK.C.1105 65.43 1 0
58 3BHK.C.1106 65.43 1 0
59 2BHK.C.1201 50.22 1 0
60 2BHK.C.1202 51.04 1 0
61 2BHK.C.1203 50.97 1 0
62 1BHK.C.1204 39.06 1 0
63 3BHK.C.1205 65.41 1 0
64 3BH.C.1206 65.43 1 0
65 1BHK.C.106 38.61 1 1
66 2BHK.C.203 50.97 1 1
67 1BHK.C.204 39.06 1 1
68 3BHK.C.206 65.43 1 1
69 2BHK.C.301 50.22 1 1
70 2BHK.C.303 50.97 1 1
71 2BHK.C.401 49.87 1 1
72 2BHK.C.403 50.97 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 60
5 X number of Slabs of Super Structure 75
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 55
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Mr. Prashant Temaskar NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Details of encumbrances
Proforma of the allotment letter and agreement for sale
Commencement Certificates
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Copy of the legal title report
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Declaration in FORM B
Status of Conveyance
Certificates of Architect (Form 4)
Other
Status of Formation of Legal Entity (Society/Co Op etc.)