MAHA-RERA Application

General Information

Individual

Individual

NARESH
JAGUMAL
KARDA
JAGUMAL CHATTUMAL KARDA
Yes

Address For Official Communication

4
KARDA HOUSE
GULMOHAR COLONY
ANAND NAGAR
BEHIND MUKTIDHAM
MAHARASHTRA
Nashik
Nashik
Nashik
Nashik Road
422101

Contact Details

02532465436

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1HARI KRISHNAResidentialNA2500NEAR MAHESHWARI BHAWAN ARTILARY CENTRE ROAD NASHIK ROAD-42210144/5B2842013-03-152013-06-15
2HARI KRISHNA PHASE IIResidentialNA2106.25ARTILARY CENTRE ROAD NASHIK ROAD NASHIK-422101S NO 45/7/1, 45/11 Part1652017-01-012017-04-05
3HARI SHRADHAResidentialNA5636.05DEOLALIGAON NASHIK-422101S No 2A/1A/1-1/20,24/2/1/4 PART, PLOT NO 1,2,3,B51352017-02-192017-04-19

Project

HARI KRISHNA PHASE III
On-Going Project
31/03/2018
31/03/2018
No
Residential
No
S NO 44/2 , 44/16A, PLOT NO 4.5
ADJ S NO 45-16B AND ADJ PLOT NO 6
ADJ S NO 44-1
ADJ S NO 45-11
7 MTRS 500 MM WIDE ROAD
MAHARASHTRA
Nashik
Nashik
Nashik
Deolaligaon
422101
2869.75
3
3
0
0

FSI Details

0
4011.49
4011.49

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 73 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Supply : YES 0 TO BE OBTAINED FROM NASHIK MUNICIPAL CORPORATION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 SEPTIC TANK WITH SOAK PIT
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 RECHARGE PI WITH BOREWELL
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA

Building Details

Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 HARI KRISHNA PHASE III BUILDING A 0 1 0 5 1 0 28
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 48.62 2 2
2 2BHK 48.63 1 1
3 2BHK 49.10 1 1
4 2BHK 50.14 4 3
5 2BHK 55.81 2 2
6 2BHK 56.18 2 2
7 2BHK 57.54 2 2
8 2BHK 57.57 1 1
9 2BHK 57.95 1 1
10 3BHK 61.81 1 1
11 3BHK 61.85 1 1
12 3BHK 62.11 2 2
13 3BHK 63.32 2 2
14 3BHK 63.50 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 80
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 20
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 58.5
Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 HARI KRISHNA PHASE III BUILDING B 0 1 0 5 1 0 21
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 35.95 4 4
2 1BHK 35.96 4 4
3 1BHK 38.35 8 8
4 2BHK 46.80 2 2
5 2BHK 46.94 2 2
6 2BHK 47.23 2 2
7 2BHK 47.35 2 1
8 2BHK 47.40 2 1
9 2BHK 47.56 2 2
10 2BHK 47.65 2 2
11 1BHK 36.38 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 HARI KRISHNA PHASE III BUILDING C 1 0 0 5 1 0 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 35.81 2 1
2 1BHK 35.91 2 1
3 1BHK 35.93 4 3
4 1BHK 35.94 2 2
5 1BHK 36.20 6 6
6 2BHK 47.28 2 2
7 2BHK 47.52 2 1
8 2BHK 47.90 2 2
9 2BHK 49.21 1 1
10 2BHK 49.26 1 1
11 2BHK 50.52 1 1
12 2BHK 50.66 1 1
13 2BHK 51.92 1 1
14 2BHK 52.03 1 1
15 2BHK 52.49 1 1
16 1BHK 36.39 2 0
17 2BHK 52.06 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
RASIK KUMARBOTHARA NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Proforma of the allotment letter and agreement for sale
Declaration in FORM B
Commencement Certificates
Building Plan Approval (IOD)
Copy of Layout Approval (in case of layout)
Other