MahaRERA Application

General Information

Other Than Individual

Organization

SAI JYOT ENTERPRISES
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SHOP 4
PARAS APARTMENT
KOLSEWADI
KATEMANIVALI
KALYAN STATION ROAD
MAHARASHTRA
Konkan
Thane
Kalyan
Kalyan-Dombivali (M Corp.)
421306

Organization Contact Details

02510000000

Past Experience Details

Member Information

Member Name Designation Photo
SHREERAM SHANTARAM PATIL Authorized Signatory View Photo
SHAKIL KHALIL KHAN Partner View Photo
SUNITA PRAMOD MISAR Partner View Photo
VIJAYPRAKASH RAMBALI YADAV Partner View Photo

Project

SAI SAHARA PHASE 1 WING B AND C
On-Going Project
31/12/2017
31/07/2018
No
Residential
No
15/11
19300954N
19301265N
19301311N
19301017N
MAHARASHTRA
Konkan
Thane
Kalyan
Titwala
421605
1904.32
2
2
0
0

FSI Details

0
2163.19
2163.19

Bank Details

THE NATIONAL CO-OP BANK LIMITED
YESB0NBL002

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 BEFORE OBTAINING COMPLETION
Energy management : YES 0 SOLAR PANNEL BEFORE OBTAINING COMPLETION
Fire Protection And Fire Safety Requirements : YES 0 BEFORE OBTAINING COMPLETION
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 AFTER OBTAINING COMPLETION
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 AFTER OBTAINING COMPLETION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 75 BEFORE OBTAINING COMPLETION
Storm Water Drains : YES 0 BEFORE OBTAINING COMPLETION
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SAI SAHARA PHASE 1 WING B AND C SAI SAHARA WING B 0 1 0 5 1 10 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK TYPE A 36.53 1 0
2 1 BHK TYPE B 36.68 1 1
3 1 BHK TYPE C 37.27 2 2
4 1 BHK TYPE D 37.28 2 2
5 1 BHK TYPE E 37.55 2 2
6 1 BHK TYPE F 37.93 2 2
7 2 BHK TYPE A 43.81 1 1
8 2 BHK TYPE B 44.72 2 1
9 2 BHK TYPE C 45.38 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 89.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 SAI SAHARA PHASE 1 WING B AND C SAI SAHARA WING C 0 1 0 5 0 10 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK TYPE A 36.43 1 1
2 1 BHK TYPE B 36.85 1 1
3 1 BHK TYPE C 37.02 2 2
4 1 BHK TYPE D 37.14 4 4
5 1 BHK TYPE E 37.7 2 2
6 1 BHK TYPE F 37.81 2 2
7 1 BHK TYPE G 38.14 2 2
8 2 BHK TYPE A 46.14 1 0
9 2 BHK TYPE B 47.63 4 2
10 2 BHK TYPE C 50.35 2 2
11 2 BHK TYPE D 51.49 4 3
12 2 BHK TYPE E 51.55 4 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 75
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
11 Overall Percentage of Completion of the work done For the entire Building /Wing 84

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
VARGHGESE JOHN NA Architect
A N AGASE NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other