MahaRERA Application

General Information

Other Than Individual

Organization

BSRD INFRABUILD PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
No

Address Details

77 - B WING
MITTAL TOWER
FREE PRESS GENERAL MARG
NARIMAN POINT
MUMBAI
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
400021

Organization Contact Details

08686070733
www.avalifespaces.co.in

Past Experience Details

Member Information

Member Name Designation Photo
RAJESH PATTIRAM YADAV Authorized Signatory View Photo
SUNIL KUMAR DEVNARAYAN YADAV Director View Photo

Project

GURU DWARKA
New Project
30/12/2022
29/12/2023
No
Residential
No
2650, 2651, 2652
DP ROAD
REHAB BUILDING NO 1
CTS 2694
NALLA
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
SHIVAJI CHOWK
DAHISAR EAST
400068
2707.82
3
0
0

FSI Details

5590
4813
10403

Bank Details

HDFC BANK
HDFC0000543

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 107 24 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 BEFORE OC
Water Conservation, Rain water Harvesting : YES 0 BEFORE OC
Energy management : YES 0 BEFORE OC
Fire Protection And Fire Safety Requirements : YES 0 BEFORE OC
Electrical Meter Room, Sub-Station, Receiving Station : YES 50 BEFORE OC
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 BEFORE OC
Water Supply : YES 0 BEFORE OC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 BEFORE OC
Storm Water Drains : YES 0 BEFORE OC
Landscaping & Tree Planting : YES 0 BEFORE OC
Street Lighting : YES 0 BEFORE OC
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 BEFORE OC
Solid Waste Management And Disposal : YES 0 BEFORE OC

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 GURU DWARKA WING A 30/06/2022 0 1 0 23 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 38.77 22 1
2 2BHK 54.05 43 4
3 1BHK 44.12 14 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 18
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 GURU DWARKA WING B 30/06/2022 0 1 0 23 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 44.02 16 1
2 1BHK 43.98 14 1
3 1BHK 38.77 22 2
4 1BHK 38.81 22 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 18
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 GURU DWARKA WING C 30/06/2022 0 1 0 23 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 54.05 22 1
2 1BHK 38.81 19 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 18

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
JITENDRA PATEL NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other