MahaRERA Application

General Information

Other Than Individual

Organization

KARDA INFRASTRUCTURE
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SHOP NO UG 109
DREAMS-THE MALL
LBS MARG
BHANDUP WEST
NEAR BHANDUP STATION
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
Mumbai City
470008

Organization Contact Details

02532465436

Past Experience Details

Member Information

Member Name Designation Photo
RAHUL KANAYALAL KALANI Partner View Photo
NARESH JAGUMAL KARDA Authorized Signatory View Photo

Project

HARI GOKULDHAM
On-Going Project
30/06/2020
30/06/2020
No
Residential
No
13/3/1
60 M Wide Road and Adj S No 14
Adj S No 13 -1-P-2
Adj S No 12
S No 13-3 Part Reservation Land
MAHARASHTRA
Nashik
Nashik
Nashik
Jail Road
422101
6060
4
4
0
454.94

FSI Details

2458.14
7090.62
9548.76

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 81 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Supply : YES 0 TO BE OBTAINED FROM NASHIK MUNICIPAL CORPORATION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 SEPTIC TANK WITH SOAK PIT
Storm Water Drains : YES 0 AS PER APPROVED BUILDING PLAN
Landscaping & Tree Planting : YES 0 AS PER APPROVED BUILDING PLAN
Street Lighting : NO 0 NA
Community Buildings : YES 0 CLUB HOUSE & GYM
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 RECHARGE PIT WITH BOREWELL
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 AS PER PROVISIONAL NOC
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : YES 0 AS PER APPROVED BUILDING PLAN
Open Parking : YES 0 AS PER APPROVED BUILDING PLAN

Building Details

Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 HARI GOKULDHAM BUILDING A 0 1 0 10 0 8 17
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 29.14 9 1
2 1BHK 38.35 9 0
3 1BHK 39.22 9 3
4 1BKH 44.08 9 0
5 2BHK 49.02 9 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 HARI GOKULDHAM BUILDING B 0 1 0 10 0 15 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 29.39 9 0
2 1BHK 29.78 27 0
3 1BHK 33.02 9 0
4 1BHK 37.38 9 0
5 1BHK 42.85 9 0
6 2BHK 48.91 9 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 HARI GOKULDHAM BUILDING C 0 1 0 10 0 15 23
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 29.39 9 0
2 1BHK 29.49 9 0
3 1BHK 32.69 9 1
4 1BHK 37.4 9 0
5 1BHK 43.39 9 0
6 1BHK 43.54 9 1
7 1BHK 43.92 9 0
8 2BHK 47.81 9 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 HARI GOKULDHAM BUILDING D 0 1 0 10 0 8 17
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 29.14 9 1
2 1BHK 39.22 9 1
3 1BHK 39.9 9 0
4 1BHK 44.08 9 0
5 1BHK 49.02 9 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
PRASHANT THEMASKAR NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Details of encumbrances
Declaration in FORM B
Commencement Certificates
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Copy of the legal title report
Proforma of the allotment letter and agreement for sale
Copy of Layout Approval (in case of layout)
Other