MahaRERA Application

General Information

Individual

Individual

MOHD FAIZAL
MOHD YASIN
MANSURI
MOHAMMEDYASIN FAUZDARAHMED MANSURI
No

Address For Official Communication

ROOM NO 2
CHAWL NO 14, TRANSIT CAMP
PAKHADI ROAD
BYCULLA WEST
JACOB CIRCLE
MAHARASHTRA
Konkan
Mumbai Suburban
Mumbai
Greater Mumbai (M Corp.) (Part) (802794)
400011

Contact Details

02223001352

Past Experience Details

Project

SANA RESIDENCY
New Project
31/12/2018
No
Others
No
PLOT NO 19
PLOT NO 18
PLOT NO 20
35 M WIDE ROAD
30 M WIDE ROAD
MAHARASHTRA
Konkan
Raigarh
Uran
Uran
PLOT NO.19, SECTOR 47
DRONAGIRI, URAN
400702
249.8
1
1
0
0

FSI Details

0
373.97
373.97

Bank Details

BANK OF INDIA
BKID0000059

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 5 0 90

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 90 NO SUB STATION RECEIVING STATION
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 90 INTERNAL ONLY N O WATER CONNECTION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 NO STP
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 95 ONLY TREE PLANTING
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SANA RESIDENCY SANA RESIDENCY 31/12/2018 0 1 0 4 1 0 5
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 30.07 4 0
2 RESIDENTIAL 28.11 7 0
3 RESIDENTIAL 19.75 1 0
4 SHOP 13.33 1 0
5 SHOP 13.47 1 0
6 SHOP 22.26 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 90
5 X number of Slabs of Super Structure 90
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 82

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
TRIARCH DESIGN STUDIO NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Architect’s Certificate on Completion of Project (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other