MahaRERA Application

General Information

Other Than Individual

Organization

Sheth Developers Private Limited
Company
NA
Do you have any Past Experience ?
Yes

Address Details

Gr and 3rd Floor
Prius Infinity
Subhash Road
Vileparle (East)
Paranjpe B Scheme
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400057

Organization Contact Details

02242933400

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1BEAUMONDEResidentialNA40792.26APPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25CTS/TPS - IV 1090 AND 1092 MAHIM DIVISION31962011-07-312012-01-10
2VASANT GALAXYResidentialNA60714JUNCTION OF MG ROAD AND LINK ROAD BANGUR NAGAR GOREGAON WEST MUMBAI236/1 TO 3237/1,238,238/1 AND 239108032010-10-312011-03-30
3VASANT GARDENResidentialNA115000SWAPNA NAGARI OFF LBS MARG MULUND WEST MUMBAI 80CTS 29, 32 P, 618718252007-03-312007-12-01
4VASANT MARVELResidentialNA29655.85WESTRN EXPRESS HIGHWAY BORIWALI EAST MUMBAI - 66CTS NO 167-C 76412011-10-312012-07-12
5VASANT VALLEYResidentialNA68373.2MALAD EAST MUMBAI 96CTS 104 A TO J11272010-06-302010-12-09
6SIGMACommercialNA9463.25ZANDU PHARMACTICAL GOKHALE ROAD SOUTH DADAR W MUMBAI - 251148/1/1149,1302,1153,1147 AND 115422602014-07-302014-12-15
7CNERGYCommercialNA8905.7APPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25FP NO 1090 AND 1092 OF TPS IV OF MAHIM DIVISION1332011-09-082011-09-08
8Vasant LawnsResidentialNA35796.75Vasant Lawns Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601S NO 35/4,5,8,9P,10P,11,51/4P,52/1P,2,53,70/2,3,9P,10P,11,13,71/1P,3P,4,5,72/1P,4P,6,7P,8P,1064652012-03-312013-11-12
9VIVIANA MALLCommercialNA49797.78Viviana Mall Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601S NO 48/1 TO 4 48/1P ,2, 3 4P 7P 49/1 TO 5, 73/1 TO 4,6, 74P,77/1 TO 4P, 5P, 78/1,2,3,81/1 AND 526P12402013-05-092013-05-09

Member Information

Member Name Designation Photo
Ashwin Natwarlal Sheth Authorized Signatory View Photo

Project

SHETH AVALON - PHASE 1
On-Going Project
30/06/2018
31/12/2020
No
Residential
No
OUT OF SURVEY NO. 48/1P, 2, 3, 4, 5P, 49/2P, 4, 73/1, 2, 3, 4, 6, 74P, 526P
15 METER WIDE SERVICE ROAD
12 METER WIDE ROAD
TMC PARKING PLAZA
JUPITER HOSPITAL
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
W E HIGHWAY POKKHARAN RD NO 2
MAJIWADA
400601
17024.53
5
5
0
5542.82

FSI Details

10389.11
25709.93
36099.04

Bank Details

INDUSIND BANK
INDB0000862

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 892 307 33

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 SHALL BE DONE PRIOR TO OC OF LAST BLDG IN LAYOUT
Energy management : YES 0 SOLAR WATER HEATING
Fire Protection And Fire Safety Requirements : YES 0 AS PER CFO NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 SUBSTATION
GYMNASIUM SWIMMING POOL CLUB HOUSE AND OTHER RECREATION FACILITIES : YES 0 SHALL BE DONE PRIOR TO OC OF LAST BLDG IN LAYOUT
Aggregate area of recreational Open Space : YES 0 SHALL BE DONE PRIOR TO OC OF LAST BLDG IN LAYOUT
Open Parking : NO 0 NA
Water Supply : YES 0 AS PER TMC WATER SUPPLY
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 PROVISION OF STP
Storm Water Drains : YES 60 SHALL BE DONE PRIOR TO OC
Landscaping & Tree Planting : YES 0 SHALL BE DONE PRIOR TO OC OF LAST BLDG IN LAYOUT
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 PROVISION OF STP
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SHETH AVALON - PHASE 1 TOWER D 31/12/2020 0 1 4 28 1 0 110
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4BHK 150.84 22 18
2 4BHK 175.66 28 25
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

98
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 92.8
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 SHETH AVALON - PHASE 1 TOWER E 31/12/2020 0 1 4 28 1 0 110
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 95.64 22 20
2 3BHK 120.84 28 25
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 20
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

93
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 87.3
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 SHETH AVALON - PHASE 1 TOWER F 31/12/2020 0 1 4 28 1 0 110
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 120.84 28 21
2 3BHK 95.64 22 20
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 17
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
11 Overall Percentage of Completion of the work done For the entire Building /Wing 84.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 SHETH AVALON - PHASE 1 TOWER G 31/12/2020 1 1 0 29 1 0 281
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 93.31 1 1
2 2BHK 68.4 59 53
3 2BHK 68.58 30 23
4 2BHK 68.66 24 18
5 Shop 87.7 1 1
6 Shop 88.76 1 1
7 Shop 93.27 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 70
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

98
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 97
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 SHETH AVALON - PHASE 1 TOWER H 31/12/2020 1 1 0 29 1 0 281
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 87.7 1 1
2 Shop 88.76 1 1
3 Shop 93.27 1 1
4 Shop 93.31 1 1
5 2BHK 68.58 30 23
6 2BHK 68.66 24 19
7 2BHK 68.4 59 50
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 86
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 65
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

5
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
11 Overall Percentage of Completion of the work done For the entire Building /Wing 62.1

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
ANIL JAGWANI NA Architect
RAMBOLL INDIA PRIVATE LIMITED NA Structural Engineer
ESKAYEM CONSULTANTS PRIVATE LIMITED NA
JM Financial Products Limited A51900000277 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other