MahaRERA Application

General Information

Other Than Individual

Organization

Envision Landmarks LLP
Others
Limited Liability Partnership
Do you have any Past Experience ?
No

Address Details

67
Ashok Sankul II, 304
Range Hills Road
Ashok Nagar
Above ICICI Bank
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411007

Organization Contact Details

02025560607
www.envisionlandmarks.com

Past Experience Details

Other Organization Type Member Information

Name Member Type
Mr Amit Sawta Shinde Individual
Mr Tejas Pravin Ghadge Individual
Mr Vikrant Subhash Indulkar Individual
Mr Kedar Shashank Ranade Individual
Mr Hemant Mohan Shinde Individual

Project

Girisparsh
On-Going Project
31/12/2018
30/06/2019
No
Residential
No
859-1
Service Road Adjacent to NH4 Highway
GAT NO 859-1-2
Remaining portion of GAT NO 859-1
Remaining portion of GAT NO 859-1
MAHARASHTRA
Pune
Pune
Haveli
Khed-Shivapur
Pune Banglore Highway
KhedShivapur
412205
6070.76
2
2
0
607.07

FSI Details

0
5697.02
5697.02

Bank Details

HDFC Bank
HDFC0004692

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 140 94 85

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Common access road
Water Conservation, Rain water Harvesting : YES 100 RWH
Energy management : YES 100 Solar Water System
Fire Protection And Fire Safety Requirements : YES 100 A Bldg
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Transformer A & B Bldg
Aggregate area of recreational Open Space : YES 100 Open Space
Open Parking : NO 0 Open Space
Water Supply : YES 100 Borewell
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 STP A & B Bldg lines
Storm Water Drains : YES 100 A & B Bldg
Landscaping & Tree Planting : YES 100 Open Space
Street Lighting : YES 100 A Bldg
Community Buildings : YES 100 Club House
Treatment And Disposal Of Sewage And Sullage Water : YES 100 STP A & B Bldg
Solid Waste Management And Disposal : YES 100 Garbage Disposal Agency

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Girisparsh A 25/05/2017 0 1 1 12 0 0 60
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 30.65 9 9
2 1 BHK 30.04 10 10
3 1 BHK 30.47 10 9
4 1 RK 24.34 1 1
5 2 BHK 42.39 2 2
6 1 BHK 29.92 2 2
7 2 BHK 43.42 10 10
8 2 BHK 43.51 8 8
9 1 BHK 30.27 8 7
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Girisparsh B 30/06/2019 0 1 1 12 0 0 80
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 RK 24.92 2 2
2 2 BHK 42.33 19 14
3 1 BHK 31.86 8 6
4 1 BHK 31.70 18 13
5 2 BHK 42.25 20 6
6 1 BHK 31.52 10 10
7 2 BHK 38.98 1 0
8 1 BHK 31.88 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Sandeep Hardikar & Associates NA Architect
KAPIL DILIP LAGHATE A52100002800 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other