MahaRERA Application

General Information

Other Than Individual

Organization

Lucina Land Development Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

16th Floor
Tower-1, Indiabulls Finance Centre
Senapati Bapat Marg
Prabhadevi West
Behind Prabhadevi Station(W)
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
400013

Organization Contact Details

02261891738

Past Experience Details

Member Information

Member Name Designation Photo
Vishal Gaurishankar Damani Authorized Signatory View Photo

Project

Indiabulls Park 4
On-Going Project
27/08/2021
31/01/2024
Yes
Residential
No
81/9 , 81/12 , 81/13 , 81/14 , 71/24,71/23A , 71/23B , 71/16 , 71/13 , 71/15
Indiabulls Park
Indiabulls Park
Indiabulls Park
Indiabulls Park
MAHARASHTRA
Konkan
Raigarh
Panvel
Kon
410207
4156.88
4
4
0
5094.74

FSI Details

31560
68703.41
100263.41

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 1628 799 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Common for Proposed Layout (Document attached)
Water Supply : YES 0 Common for Proposed Layout (Document attached)
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Common for Proposed Layout (Document attached)
Storm Water Drains : YES 0 Common for Proposed Layout (Document attached)
Landscaping & Tree Planting : YES 0 Common for Proposed Layout (Document attached)
Street Lighting : YES 0 Common for Proposed Layout (Document attached)
Mini football court Multipurpose Court Cricket Net Practice Basketball Court : YES 0 Shall be done post completion of all RERA phases
Aggregate area of recreational Open Space : YES 0 Common for Proposed Layout (Document attached)
Landscape mound Multipurpose Lawn Swimming Pool Kids’ Pool : YES 0 Shall be done post completion of all RERA phases
Open Parking : NO 0 NA
Community Buildings : YES 0 Common for Proposed Layout (Document attached)
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Common for Proposed Layout (Document attached)
Solid Waste Management And Disposal : YES 0 Common for Proposed Layout (Document attached)
Kid’s Play area Seating Alcove Lounge Deck Pergola Skating Area : YES 0 Shall be done post completion of all RERA phases
Water Conservation, Rain water Harvesting : YES 0 Common for Proposed Layout (Document attached)
Energy management : YES 0 Common for Proposed Layout (Document attached)
Fire Protection And Fire Safety Requirements : YES 0 Common for Proposed Layout (Document attached)
Multipurpose Hall Gymnasium Amphitheatre/ Yoga steps : YES 0 Shall be done post completion of all RERA phases
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Common for Proposed Layout (Document attached)

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Indiabulls Park 4 3 A 31/01/2024 0 1 5 38 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK S 68.08 66 62
2 2BHK M 68.95 140 133
3 3BHK 99.43 62 58
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 40
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 4
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Indiabulls Park 4 3 B 31/01/2024 0 1 5 38 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK S 68.08 66 56
2 2BHKM 68.95 140 131
3 3BHK 99.43 62 61
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 10
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 Indiabulls Park 4 2 A 31/01/2024 0 1 3 33 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK S 68.08 53 40
2 2BHKM 68.95 116 84
3 3BHK 99.43 52 36
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 Indiabulls Park 4 2 B 31/01/2024 0 1 3 33 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK S 68.08 53 31
2 2BHK M 68.95 116 77
3 3BHK 99.43 52 30
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Anupam De & Associates NA Architect

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Indiabulls Park 4 Civil Judge Senior Division Panvel 379/2013 Civil No Suit 2013 Pending for hearing
NA
Indiabulls Park 4 Civil Judge Senior Division Panvel 167/2013 Civil No Suit 2013 Pending for hearing
NA
Indiabulls Park 4 Civil Judge Senior Division Panvel 112/2015 Civil No Suit 2015 Pending for hearing
NA
Indiabulls Park 4 Civil Judge Senior Division Panvel 214/2015 Civil No Suit 2015 Pending for hearing
NA
Indiabulls Park 4 Civil Judge Senior Division Panvel 94/2014 Civil No Suit 2014 Pending for hearing
NA

Uploaded Documents

Document Name Uploaded Document
Declaration in FORM B
Details of encumbrances
Commencement Certificates
Copy of the legal title report
Building Plan Approval (IOD)
Proforma of the allotment letter and agreement for sale
Copy of Layout Approval (in case of layout)
Details of encumbrances
Other