MahaRERA Application

General Information

Other Than Individual

Organization

Indiabulls Infraestate Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

16th Floor
Tower 1, Indiabulls Finance Centre
Senapati Bapat Marg
Prabhadevi (W)
Behind Prabhadevi Station (W)
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
400013

Organization Contact Details

02261899707

Past Experience Details

Member Information

Member Name Designation Photo
Vishal Gaurishankar Damani Authorized Signatory View Photo

Project

Indiabulls Blu Tower A
On-Going Project
30/09/2018
31/12/2020
No
Residential
No
131, 132
Indiabulls Blu
Indiabulls Blu
Indiabulls Blu
Indiabulls Blu
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
Dr E Moses Rd
Worli
400013
746.64
1
1
0
9629.09

FSI Details

730
17769.38
18499.38

Bank Details

State Bank of India
SBIN0001884

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 490 304 30

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 90 Common for P1 to P5 (Proposed Layout Attached)
Water Conservation, Rain water Harvesting : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Energy management : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Fire Protection And Fire Safety Requirements : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Aggregate area of recreational Open Space : YES 80 Common for P1 to P5 (Proposed Layout Attached)
Open Parking : NO 0 NA
Water Supply : YES 95 Common for P1 to P5 (Proposed Layout Attached)
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 Common for P1 to P5 (Proposed Layout Attached)
Storm Water Drains : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Landscaping & Tree Planting : YES 80 Common for P1 to P5 (Proposed Layout Attached)
Street Lighting : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Community Buildings : YES 80 Common for P1 to P5 (Proposed Layout Attached)
Treatment And Disposal Of Sewage And Sullage Water : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Solid Waste Management And Disposal : YES 100 Common for P1 to P5 (Proposed Layout Attached)

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Indiabulls Blu Tower A Tower A 31/12/2020 2 1 4 47 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2.5 BHK 93.51 8 4
2 3 BHK 93.51 1 1
3 3 BHK 108.98 1 1
4 3 BHK 109.48 1 1
5 3 BHK 119.96 9 8
6 3 BHK 111.63 1 0
7 3 BHK 118.23 1 1
8 3 BHK 188.69 1 1
9 3 BHK 120.27 12 10
10 3 BHK 110.4 8 6
11 3 BHK 111.32 1 1
12 3 BHK STUDY 188.23 1 1
13 4 BHK 159.4 12 11
14 2 BHK STUDY AV RM 171.21 1 1
15 5 BHK STUDY FMLY 173.2 1 1
16 5 BHK LIBRARY RM 468.85 1 1
17 4 BHK 188.69 1 1
18 4 BHK 155.48 1 0
19 4 BHK 153.12 1 1
20 4 BHK 156.6 1 1
21 4 BHK 154.37 1 1
22 4 BHK 151.14 1 0
23 4 BHK FAMILY 188.23 2 2
24 4 BHK STUDY 280.59 1 1
25 4 BHK STUDY 474.16 1 1
26 4 BHK STUDY 262.95 1 0
27 5 BHK 203.87 1 0
28 5 BHK FAMILY 217.46 1 1
29 5 BHK FLY LIB RM GYM 465.61 1 0
30 6 BHK FLY ROOM 652.55 1 1
31 PENTHOUSE 960.03 1 1
32 1RK 53.85 1 1
33 2 BHK 76.86 11 11
34 2 BHK 159.4 1 1
35 2 BHK 120.27 1 1
36 2 BHK 75.16 9 7
37 2 BHK 77.67 10 8
38 3 BHK 97.15 8 7
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 98
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 98
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

99
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 99.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
ANUPAM DE & ASSOCIATES NA Architect
Octave Consultants NA Architect
Mr Rajeev Akshikar NA Structural Engineer
Walker Chandiok & CO LLP NA Other
Sundar Venkataraman & Co NA Other

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Details of encumbrances
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other