MahaRERA Application

General Information

Other Than Individual

Organization

Indiabulls Infraestate Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

16th Floor
Tower 1, Indiabulls Finance Centre
Senapati Bapat Marg
Prabhadevi (W)
Behind Prabhadevi Station (W)
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
400013

Organization Contact Details

02261891738

Past Experience Details

Member Information

Member Name Designation Photo
Vishal Gaurishankar Damani Authorized Signatory View Photo

Project

Indiabulls Blu Tower B
On-Going Project
30/09/2018
31/12/2020
No
Residential
No
131, 132
Indiabulls Blu
Indiabulls Blu
Indiabulls Blu
Indiabulls Blu
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
Dr E Moses Rd
Worli
400013
1022.73
1
1
0
9629.09

FSI Details

700
26603.15
27303.15

Bank Details

State Bank of India
SBIN0001884

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 457 360 30

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Water Conservation, Rain water Harvesting : YES 90 Common for P1 to P5 (Proposed Layout Attached)
Energy management : YES 0 Common for P1 to P5 (Proposed Layout Attached)
Fire Protection And Fire Safety Requirements : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Electrical Meter Room, Sub-Station, Receiving Station : YES 90 Common for P1 to P5 (Proposed Layout Attached)
Aggregate area of recreational Open Space : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Open Parking : NO 0 NA
Water Supply : YES 90 Common for P1 to P5 (Proposed Layout Attached)
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 Common for P1 to P5 (Proposed Layout Attached)
Storm Water Drains : YES 90 Common for P1 to P5 (Proposed Layout Attached)
Landscaping & Tree Planting : YES 50 Common for P1 to P5 (Proposed Layout Attached)
Street Lighting : YES 10 Common for P1 to P5 (Proposed Layout Attached)
Community Buildings : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Treatment And Disposal Of Sewage And Sullage Water : YES 100 Common for P1 to P5 (Proposed Layout Attached)
Solid Waste Management And Disposal : YES 100 Common for P1 to P5 (Proposed Layout Attached)

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Indiabulls Blu Tower B Tower B 31/12/2020 2 1 4 51 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 BHK 195.01 1 1
2 4 BHK 196.67 1 1
3 4 BHK FAMILY STUDY 343.97 1 1
4 4 BHK FAMILY STUDY 359.92 1 1
5 5 BHK 301.85 1 1
6 5 BHK 374.56 1 1
7 3 BHK 139.44 1 1
8 3 BHK 148.95 1 0
9 3 BHK 146.63 1 1
10 7.5BHK FAMILY RM TER 658.23 1 1
11 7.5BHK FAMILY RM TER 738.68 1 1
12 3BHK 137.34 2 0
13 7.5 BHKFAMILY RM 653.98 1 1
14 3 BHK 148.78 1 0
15 4BHK 163.45 2 2
16 4BHK 163.51 13 13
17 4BHK 194.91 12 12
18 4BHK 195.24 2 1
19 3BHK 137.05 13 8
20 4BHK 163.49 11 7
21 3BHK 148.75 12 11
22 3 BHK 139.74 3 2
23 4BHK 194.74 13 12
24 3 BHK 148.65 13 6
25 3BHK 136.96 11 11
26 6.5BHK GYM 508.13 1 1
27 3BHK 148.57 2 0
28 3BHK 136.24 1 0
29 4BHK FAMILY RM 481.82 1 1
30 6BHK FAMILY LONGUE 647.47 1 1
31 4BHKTHEATER POOJA RM 343.97 1 1
32 4BHK 285.24 1 1
33 4.5BHK 277.84 1 1
34 4.5BHK 293.42 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 50
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 85
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 60
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

95
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 88

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Anupam De & Associates NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Declaration in FORM B
Details of encumbrances
Copy of the legal title report
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates
Copy of Layout Approval (in case of layout)
Proforma of the allotment letter and agreement for sale
Commencement Certificates
Details of encumbrances
Commencement Certificates
Certificates of Architect (Form 4)
Status of Conveyance
Other
Status of Formation of Legal Entity (Society/Co Op etc.)