MahaRERA Application

General Information

Other Than Individual

Organization

Indiabulls Infraestate Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

16th Floor
Tower 1, Indiabulls Finance Centre
Senapati Bapat Marg
Prabhadevi (W)
Behind Prabhadevi Station (W)
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
400013

Organization Contact Details

02261891738

Past Experience Details

Member Information

Member Name Designation Photo
Vishal Gaurishankar Damani Authorized Signatory View Photo

Project

Indiabulls Blu Tower C
On-Going Project
30/09/2018
31/12/2020
No
Residential
No
131, 132
Indiabulls Blu
Indiabulls Blu
Indiabulls Blu
Indiabulls Blu
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
Dr E Moses Rd
Worli
400013
750.41
1
1
0
9629.09

FSI Details

1790
20600.18
22390.18

Bank Details

State Bank of India
SBIN0001884

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 153 125 60

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 30 Common for P1 to P5 (Proposed Layout Attached)
Water Conservation, Rain water Harvesting : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Energy management : YES 0 Common for P1 to P5 (Proposed Layout Attached)
Fire Protection And Fire Safety Requirements : YES 90 Common for P1 to P5 (Proposed Layout Attached)
Electrical Meter Room, Sub-Station, Receiving Station : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Aggregate area of recreational Open Space : YES 50 Common for P1 to P5 (Proposed Layout Attached)
Open Parking : YES 0 Common for P1 to P5 (Proposed Layout Attached)
Water Supply : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Storm Water Drains : YES 80 Common for P1 to P5 (Proposed Layout Attached)
Landscaping & Tree Planting : YES 25 Common for P1 to P5 (Proposed Layout Attached)
Street Lighting : YES 0 Common for P1 to P5 (Proposed Layout Attached)
Community Buildings : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Treatment And Disposal Of Sewage And Sullage Water : YES 50 Common for P1 to P5 (Proposed Layout Attached)
Solid Waste Management And Disposal : YES 80 Common for P1 to P5 (Proposed Layout Attached)

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Indiabulls Blu Tower C Indiabulls Blu Tower C 31/12/2020 2 1 6 56 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Simplex Type 8 357.39 1 1
2 Simplex Type 1 483.91 17 16
3 Duplex 1 948.03 1 1
4 Duplex 2 948.03 1 1
5 Duplex 4 953.47 1 1
6 Duplex 3 953.47 1 1
7 Simplex Type 3 487.33 1 1
8 Simplex Type 5 490.71 3 3
9 PENTAHOUSE TERRACE 3419.6 1 1
10 Simplex Type 7 487.44 1 1
11 Simplex Type 2 367.45 3 3
12 Simplex Type 4 371.39 1 1
13 Simplex Type 6 372.23 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 50
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 81

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Anupam De & Associates NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Declaration in FORM B
Details of encumbrances
Commencement Certificates
Copy of the legal title report
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Copy of Layout Approval (in case of layout)
Proforma of the allotment letter and agreement for sale
Commencement Certificates
Details of encumbrances
Commencement Certificates
Status of Conveyance
Certificates of Architect (Form 4)
Other
Status of Formation of Legal Entity (Society/Co Op etc.)