MahaRERA Application

General Information

Other Than Individual

Organization

Indiabulls Infraestate Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

16th Floor
Tower 1, Indiabulls Finance Centre
Senapati Bapat Marg
Prabhadevi (W)
Behind Prabhadevi Station (W)
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
400013

Organization Contact Details

02261891738

Past Experience Details

Member Information

Member Name Designation Photo
Vishal Gaurishankar Damani Authorized Signatory View Photo

Project

Indiabulls Blu Tower D
On-Going Project
30/09/2018
30/06/2021
No
Residential
No
131, 132
Indiabulls Blu
Indiabulls Blu
Indiabulls Blu
Indiabulls Blu
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
Dr E Moses Rd
Worli
400013
1126.01
1
1
0
9629.09

FSI Details

11500
8088.22
19588.22

Bank Details

State Bank of India
SBIN0001884

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 194 151 82

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 10 Common for P1 to P5 (Proposed Layout Attached)
Water Conservation, Rain water Harvesting : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Energy management : YES 0 Common for P1 to P5 (Proposed Layout Attached)
Fire Protection And Fire Safety Requirements : YES 25 Common for P1 to P5 (Proposed Layout Attached)
Electrical Meter Room, Sub-Station, Receiving Station : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Aggregate area of recreational Open Space : YES 50 Common for P1 to P5 (Proposed Layout Attached)
Open Parking : NO 0 NA
Water Supply : YES 35 Common for P1 to P5 (Proposed Layout Attached)
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Storm Water Drains : YES 80 Common for P1 to P5 (Proposed Layout Attached)
Landscaping & Tree Planting : YES 10 Common for P1 to P5 (Proposed Layout Attached)
Street Lighting : YES 0 Common for P1 to P5 (Proposed Layout Attached)
Community Buildings : YES 70 Common for P1 to P5 (Proposed Layout Attached)
Treatment And Disposal Of Sewage And Sullage Water : YES 50 Common for P1 to P5 (Proposed Layout Attached)
Solid Waste Management And Disposal : YES 80 Common for P1 to P5 (Proposed Layout Attached)

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Indiabulls Blu Tower D Tower D 30/06/2021 2 1 6 33 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 PENTHOUSE 1165.22 1 1
2 3 BHK 272.44 3 1
3 2BHK 174.2 1 1
4 2BHK 160.82 1 1
5 4BHK 257.73 1 1
6 5BHK 336.29 1 1
7 5BHK 336.54 2 2
8 3BHK 202.94 1 1
9 3BHK 251.97 1 1
10 4BHK 244.12 3 3
11 3BHK 151 1 1
12 3BHK 170.07 1 0
13 3BHK 197.74 1 1
14 5BHK 316.64 1 1
15 6BHK 437.44 1 1
16 6BHK 447.09 3 3
17 10BHK 673.8 1 1
18 4BHK 401.86 1 1
19 5BHK 334.56 5 3
20 4BHK 244.24 5 3
21 5BHK 352.81 6 5
22 3BHK 107.42 8 0
23 3BHK 128.29 10 7
24 6BHK 465.01 3 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 50
5 X number of Slabs of Super Structure 85
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 68
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 52.3

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Anupam De & Associates NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Declaration in FORM B
Details of encumbrances
Copy of the legal title report
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates
Copy of Layout Approval (in case of layout)
Proforma of the allotment letter and agreement for sale
Commencement Certificates
Details of encumbrances
Commencement Certificates
Status of Conveyance
Certificates of Architect (Form 4)
Other
Status of Formation of Legal Entity (Society/Co Op etc.)