MahaRERA Application

General Information

Other Than Individual

Organization

KUSHAL SAGAR BUILDERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

OLD SURVEY 192 NEW SURVEY 22
H NO 9B/1
SHEWALWADI
SHEWALWADI
PUNE
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
412307

Organization Contact Details

02026134314

Past Experience Details

Member Information

Member Name Designation Photo
VAIBHAV RAMAKANT BHALERAO Partner View Photo
VAIBHAV RAMAKANT BHALERAO Authorized Signatory View Photo
SAGAR RAMAKANT BHALERAO Partner View Photo
ANKIT SURESH RATHOD Partner View Photo
MITA MAHESH RATHOD Partner View Photo

Project

KUSHAL SAGAR GALAXY
On-Going Project
31/12/2018
31/12/2018
No
Residential
No
Old 192 New 22 H no 9B/1 SHEWALWADI PUNE
Sadashiv Shankar Shewale
adjouring part
Road
Canel
MAHARASHTRA
Pune
Pune
Haveli
Shewalewadi
412307
2400
3
3
0
0

FSI Details

0
2165.78
2165.78

Bank Details

SARASWAT CO OPERATIVE BANK
SRCB0000034

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 24 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 80 SIDE MARGINGS AS PER REQUIREMENT
Water Conservation, Rain water Harvesting : YES 75 COMPLETED FOR A AND B
Energy management : YES 20 -
Fire Protection And Fire Safety Requirements : YES 80 -
Electrical Meter Room, Sub-Station, Receiving Station : YES 75 METERS ONLY
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 -
Water Supply : YES 100 BOREWELL
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 DRAINAGE LINE PLUS SEPTIC TANK
Storm Water Drains : YES 100 0
Landscaping & Tree Planting : YES 60 TREE PLANTATION DONE
Street Lighting : YES 80 PROVIDED FOR A AND B
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 KUSHAL SAGAR GALAXY KUSHAL SAGAR GALAXY-WING A 31/12/2018 0 1 0 6 0 12 8
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 44.3 8 5
2 1 BHK 44.66 12 7
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 KUSHAL SAGAR GALAXY KUSHAL SAGAR GALAXY-WING B 31/12/2018 0 1 0 6 0 10 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 44.3 8 2
2 1BHK 44.66 11 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 KUSHAL SAGAR GALAXY KUSHAL SAGAR GALAXY WING-C 31/12/2018 0 1 0 5 0 10 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 44.66 8 4
2 1BHK 44.3 9 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
PARVEZ JAMADAR AND ASSOCIATES NA Architect
ARUN GOKHALE AND ASSOCIATES NA Engineer
JITENDRA C CHHAJED NA Other Professional

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other