MahaRERA Application

General Information

Other Than Individual

Organization

Shantee Housing
Partnership
NA
Do you have any Past Experience ?
No

Address Details

ground floor
shreenath bhavan
60ft road
KT village
near indu hospital
MAHARASHTRA
Konkan
Palghar
Vasai
Vasai-Virar City (M Corp)
401202

Organization Contact Details

02502331171

Past Experience Details

Member Information

Member Name Designation Photo
niyaz abdul samad pathan Partner View Photo
Raaz abdul samad pathan Authorized Signatory View Photo

Project

SUNSHINE SAPPHIRE
On-Going Project
31/03/2017
30/05/2019
Yes
Residential
No
S.no.63 H.no.2/1
Open plot
Road
Open plot
Open plot
MAHARASHTRA
Konkan
Palghar
Vasai
Vasai-Virar City (M Corp)
Gokhiware
Vasai East
401202
1100
2
2
0
0

FSI Details

1800
4146.99
5946.99

Bank Details

THE COSMOS CO-OP BANK LTD
COSB0000116

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 28 12 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 TERRACE RAINS WILL BE COLLECTED & INFILTER INTO GR
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 WIP
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 WIP
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 Will start once VVCMC water supply commences
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 WIP
Storm Water Drains : YES 100 WIP
Landscaping & Tree Planting : YES 100 WIP
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 WIP
Solid Waste Management And Disposal : YES 100 ON POSSESSION

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SUNSHINE SAPPHIRE SUNSHINE SAPPHIRE A WING 30/05/2019 0 1 0 15 1 0 17
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 32.71 14 8
2 2BHK 50.09 14 12
3 1BHK 33.21 54 43
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 SUNSHINE SAPPHIRE SUNSHINE SAPPHIRE B WING 30/05/2019 0 1 0 15 1 0 11
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 32.21 28 13
2 1BHK 33.14 27 9
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Sanat Mehta & Asso NA Architect
Mufaddal Merchant NA Architect
Jayshree Krishna Consulting Egineer NA Structural Engineer
Mohammed Shoed Bhati NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other