MahaRERA Application

General Information

Other Than Individual

Organization

NIVASA REALTY
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SR. NO. 285/3
NIMBALKARNAGAR
UTTRESHWAR ROAD
LOHEGAON
LOHEGAON
MAHARASHTRA
Pune
Pune
Haveli
LOHGAON
411047

Organization Contact Details

02040028000

Past Experience Details

Member Information

Member Name Designation Photo
KIRTI MANISH KASAT Partner View Photo
RAHUL RAM MOHTA Authorized Signatory View Photo
VILAS ANKUSH SHINDE Partner View Photo
ANIL PRANNATH ABROL Authorized Signatory View Photo

Project

NIVASA UDAAN
On-Going Project
31/12/2018
30/06/2019
No
Residential
Yes
SR. NO. 285/3
SR NO 285
SR NO 285
ROAD
SR NO 285
MAHARASHTRA
Pune
Pune
Haveli
LOHGAON
411047
6593.8
2
2
0
1000

FSI Details

1027.43
6034.81
7062.24

Bank Details

AXIS BANK
UTIB0002136

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
NIVASA UDAAN BALU SUBHASH NIMBALKAR Others Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
NIVASA UDAAN BALU SUBHASH NIMBALKAR Others Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
NIVASA UDAAN RAMESH PANDIT NIMBALKAR Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
NIVASA UDAAN RAMESH PANDIT NIMBALKAR Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 72 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 INTERNAL ROAD PROPOSED
Water Conservation, Rain water Harvesting : YES 0 AS PER CONSULTANT DRAWING
Energy management : YES 0 SOLAR WATER HEATER
Fire Protection And Fire Safety Requirements : YES 0 AS PER PROVISIONAL FIRE NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 -
Aggregate area of recreational Open Space : YES 0 1000 SQ.MTRS
Open Parking : YES 0 -
Water Supply : YES 0 TO BE PROVIDED BY PMRDA / PMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 AS PER CONSULTANT DRAWING
Storm Water Drains : YES 0 AS PER CONSULTANT DRAWING
Landscaping & Tree Planting : YES 0 ALONG THE COMPOUND WALL
Street Lighting : NO 0 NA
Community Buildings : YES 0 PROPOSED SANCTION
Treatment And Disposal Of Sewage And Sullage Water : YES 0 AS PER CONSULTANT DRAWING
Solid Waste Management And Disposal : YES 0 AS PER CONSULTANT DRAWING

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 NIVASA UDAAN A 30/06/2019 0 1 0 11 0 20 42
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK TYPE 4 33.65 1 0
2 2BHKTYPE15 46.65 1 1
3 1 BHK TYPE 2 32.43 2 1
4 2 BHK TYPE 8 46.68 5 4
5 2BHKTYPE10 52.65 2 2
6 2BHKTYPE12 52.92 5 5
7 2 BHK TYPE 1 44.98 5 4
8 2 BHK TYPE 3 45.26 4 4
9 2 BHK TYPE 4 45.27 1 1
10 2 BHK TYPE 5 45.42 4 2
11 2 BHK TYPE 9 46.96 5 4
12 2 BHK TYPE 2 45.13 5 4
13 2 BHK TYPE 6 46.26 5 5
14 2 BHK TYPE 7 46.51 4 3
15 2BHKTYPE11 52.77 5 5
16 2BHKTYPE13 53.03 4 3
17 1 BHK TYPE 1 32.35 10 7
18 2BHKTYPE14 53.19 4 3
19 1 BHK TYPE 3 32.75 8 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 80
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

30
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 47
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 NIVASA UDAAN B 0 1 0 11 0 52 30
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK TYPE 1 50.46 1 1
2 3 BHK TYPE 1 69.99 4 0
3 1 BHK TYPE 3 33.26 18 7
4 1 BHK TYPE 5 33.41 3 2
5 1 BHK TYPE 6 31.44 1 1
6 1 BHK TYPE 7 31.54 3 3
7 1 BHK TYPE 8 31.73 1 1
8 1 BHK TYPE 10 31.2 5 4
9 1 BHK TYPE 1 31.15 5 5
10 1 BHK TYPE 2 33 25 10
11 1 BHK TYPE 4 31.57 4 3
12 1 BHK TYPE 9 33.15 5 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 80
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 40
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

30
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 47

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
VINOD DHUSIA NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other