MahaRERA Application

General Information

Other Than Individual

Organization

ATRIUM HOMES LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

Sr No5, 6, 7
Atrium Skyward
Undri Pisoli Road Hole Vasti
Undri
Opp to Bishop's School
MAHARASHTRA
Pune
Pune
Haveli
UNDRI
411060

Organization Contact Details

09850085557

Past Experience Details

Member Information

Member Name Designation Photo
Sanjay Nemichand Lohade Authorized Signatory View Photo
Gauri Sanjay Lohade Authorized Signatory View Photo
Deepa Santosh Mutha Authorized Signatory View Photo
Rajesh Shriram Kasat Authorized Signatory View Photo
Dharmendra Labhshankar Joshi Authorized Signatory View Photo
Tejpal Pukhraj Ranka Partner View Photo

Project

Atrium Skyward
On-Going Project
31/07/2019
31/12/2020
No
Residential
No
Sr No 5,6,7
12m Wide Village Road
Adjoining Private Property S No 7 Part Undri
Adjoining Private Property S No 5 Part Undri
9m Wide Internal Road
MAHARASHTRA
Pune
Pune
Haveli
UNDRI
Hadapsar Undri Road
Hole Vasti
411060
6099.41
2
2
0
0

FSI Details

3415.99
8793.65
12209.64

Bank Details

HDFC BANK
HDFC0000103

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 45 31 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Roads
Water Conservation, Rain water Harvesting : YES 0 --
Energy management : YES 0 As per local authority.
Fire Protection And Fire Safety Requirements : YES 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 As per Local Authority
Aggregate area of recreational Open Space : NO 0 As per Consultant Dwg. As per MSEDCL rules.
Open Parking : YES 0 NA
Water Supply : YES 0 No footpaths.
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 20 As per local authority.
Storm Water Drains : YES 0 As per local authority.
Landscaping & Tree Planting : YES 0 As per local authority.
Street Lighting : YES 0 As per local authority
Community Buildings : YES 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 NA
Solid Waste Management And Disposal : NO 0 As per local authority.

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Atrium Skyward Wing B 31/12/2020 0 1 0 12 0 0 20
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RHK 30.08 4 1
2 1RHK 30.35 10 8
3 1 RHK 31.49 10 7
4 1 RHK 32.11 10 5
5 1 RHK 33.65 3 2
6 1.5RHK 38.36 9 7
7 1 RHK 32.26 2 0
8 1 RHK 33.03 1 0
9 1 RHK 33.5 1 0
10 1 RHK 29.76 12 0
11 1 RHK 29.92 5 2
12 1.5RHK 52.78 2 0
13 1RHK 35.71 6 0
14 1 RHK 46.89 1 0
15 1 RHK 30.84 1 0
16 1.5RHK 40.17 10 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 20
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 54
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Atrium Skyward Wing C 31/12/2020 0 1 0 12 0 0 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 RHK 50.41 1 0
2 2 RHK 68.48 2 0
3 2 RHK 70.27 2 0
4 1 RHK 34.13 2 0
5 1 RHK 34.30 8 2
6 1 RHK 36.99 12 6
7 2 RHK 48.88 3 3
8 2 RHK 49.05 3 3
9 2 RHK 49.2 19 16
10 2 RHK 49.9 5 5
11 2 RHK 53.55 5 2
12 4 RHK 102.17 2 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 75
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

70
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
11 Overall Percentage of Completion of the work done For the entire Building /Wing 74.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Cubix Architects Associates NA Architect
Sunil Mutalik and Associates NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other
Other
Other
Other
Other