MahaRERA Application

General Information

Individual

Individual

CHIRAG
KIRIT
SHAH
KIRIT BHOGILAL SHAH
Yes

Address For Official Communication

SHOP 3 GREEN ABODE
OM SHIV PARVATI
PLOT NO 101 SECTOR 29
VASHI NAVI MUMBAI
NEAR RAJIV GANDHI GARDEN
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400705

Contact Details

09930085401
WWW.GREENABODEBUILDERS.COM

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1GREEN ABODEResidentialNA1500PLOT NO 69 SECTOR 19 AIROLIPLOT NO 69 SECTOR 191452013-12-312013-06-14
2GREEN ABODEResidentialNA1227B AND C WING Plot No 8 out of 746 1A 746 1B 746 2B 746 1B1C 746 2A situate at Sai Nagar Village Old Panvel in Taluka Panvel of Dist Raigad -410 206 Plot No 8 out of 746 1A 746 1B 746 2B 746 1B1C 746 2A2372017-12-312017-04-28

Project

GREEN ABODE
On-Going Project
31/12/2017
31/12/2017
No
Residential
No
Plot No 8 out of 746/1A 746/1B 746/2B 746/1B 1C 746/2A
Plot No 11 out of 746 1A 746 1B 746 2B 746 1B 1C
Plot No 6 out of 746 1A 746 1B 746 2B 746 1B 1C
S No 793
Plot No 9 out of 746 1A 746 1B 746 2B 746 1B 1C
MAHARASHTRA
Konkan
Raigarh
Panvel
Panvel
SAI NAGAR ROAD
OLD PANVEL
410206
613.5
1
1
0
0

FSI Details

0
736
736.00

Bank Details

STATE BANK OF INDIA
SBIN0003736

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 13 10 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Drive Way
Water Conservation, Rain water Harvesting : YES 100 Done
Energy management : NO 100 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Done meter room and receiving feeder
Badminton Court : YES 100 On Ground Floor
Filter : YES 100 Common water filter on Terrace
Generator : YES 100 Done
Gymnasium : YES 100 Done
Lift : YES 100 Johnson
Solar Water Heater : YES 100 Done
Steam bath : YES 100 Done
Table Tenice and Caram : YES 100 Done on Ground Floor Society office
Terrace : YES 100 Party Area and Artificial lawn Garden
Aggregate area of recreational Open Space : NO 100 NA
Open Parking : NO 0 NA
Water Supply : YES 100 Provided by PMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 Provided by PMC
Storm Water Drains : YES 100 Lines and connection
Landscaping & Tree Planting : YES 100 Done
Street Lighting : YES 100 Provided by PMC
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 GREEN ABODE GREEN ABODE 31/12/2017 0 1 0 5 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 ONE BHK 28.02 4 4
2 TWO BHK 47.10 4 2
3 ONE BHK 29.13 4 2
4 TWO BHK 46.57 4 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
O7 Associate Architect NA Architect
Structural Concept Designs Pvt. Ltd NA Structural Engineer
RAJAL ENTERPRISES NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Status of Conveyance
Other
Other
Other
Other
Other