MahaRERA Application

General Information

Other Than Individual

Organization

RSM COLONISERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

1003
CASABLANCA
PLOT NO 45 SECTOR 11
CBD BELAPUR
NAVI MUMBAI
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400614

Organization Contact Details

02241270107
www.unimont.in

Past Experience Details

Member Information

Member Name Designation Photo
SURESH DHANAJI BHANUSHALI Partner View Photo
ANIL DHANAJI BHANUSHALI Partner View Photo
KALPESH HIMATLAL KHANIYA Authorized Signatory View Photo
KGK DWELLINGS PRIVATE LIMITED THROUGH DIRECTOR SAMPAT RAJ KOTHARI Partner View Photo
MAHENDRA GHASILAL RATHOR Authorized Signatory View Photo

Project

RSM ATHENA
On-Going Project
31/03/2019
31/03/2020
Yes
Others
No
PLOT NO 338 SECTOR 19 ULWE
PROPOSED 11 MTR WIDE ROAD
FUTURE DEVELOPMENT
PROPOSED 15 MTR WIDE ROAD
PLOT NO 337
MAHARASHTRA
Konkan
Raigarh
Panvel
Ulawe
PLOT NO 338 SECTOR 19
ULAWE
410206
1049.98
1
1
0
00

FSI Details

0
1572.98
1572.98

Bank Details

ICICI BANK
ICIC0000873

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 15 0 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 Completed
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 Completed
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 NO SUB STATION
BRANDED HIGH SPEED ELEVATOR OF BRAND KONE : YES 100 Completed
FITNESS CENTRE SOCIETY OFFICE INDOOR GAMES AREA PODIUM GARDEN CHILDREN PLAY AREA : YES 70 WIP
VIDEO DOOR SYSTEM : YES 70 WIP
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 100 5
Water Supply : YES 100 Completed
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 NO STP
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 100 Completed
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 RSM ATHENA RSM ATHENA 31/03/2020 0 1 1 15 1 5 15
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 17.42 1 1
2 1BHK 18.9 1 1
3 SHOP 25.76 1 0
4 SHOP 24.32 1 0
5 1BHK 26.6 1 1
6 SHOP 11.66 1 1
7 SHOP 10.01 2 2
8 SHOP 18.07 1 1
9 1BHK 29.19 12 12
10 2BHK 32.43 12 12
11 1BHK 17.09 12 11
12 1BHK 25.15 12 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SHREE MANIBHADRA CONSTRUCTION NA Contractor
TRIARCH DESIGN STUDIO NA Architect
S V PATEL & ASSOCIATES NA Structural Engineer
ACE PROJECT MANAGEMENT CONSULTANT NA

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
RSM ATHENA CIVIL JUDGE SENIOR DIVISION PANVEL DISTRICT RAIGAD SCS NO 96 Civil No Suit 2016 PENDING
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other