MahaRERA Application

General Information

Other Than Individual

Organization

DELIGHT DEVELOPERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

RH 1
TULSI PRATHAM APARTMENT
SECTOR 6
MOSHI PRADHIKARAN
-
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
412105

Organization Contact Details

02060737333

Past Experience Details

Member Information

Member Name Designation Photo
DINESHBHAI RAVJIBHAI PATEL Authorized Signatory View Photo
PARESHBHAI VITTHALBHAI PATEL Authorized Signatory View Photo

Project

ECO PARK
On-Going Project
01/06/2018
31/12/2019
30/06/2021
No
Others
Yes
GAT NUMBER 506
GAT NUMBER 507
GAT NUMBER 506 PART
GAT NUMBER 487 PART
PROPOSED A BUILDING
MAHARASHTRA
Pune
Pune
Haveli
CHARHOLI
CHARHOLI
CHARHOLI
412105
3882.46
2
2
0
616.78

FSI Details

320.04
7580.07
7900.11

Bank Details

KOTAK MAHINDRA BANK
KKBK0000725

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
ECO PARK PRAKASH TAPKIR Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
ECO PARK VIJAY GULAB TAPKIR Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
ECO PARK KASUBAI UTTAM MOLAK Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
ECO PARK SADHANA SUDAM SHINDE Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 48 22 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 70 COMMON FOR BUILDINGS A and B and C
Water Conservation, Rain water Harvesting : YES 70 COMMON FOR BUILDINGS A and B and C
Energy management : YES 0 COMMON FOR BUILDINGS A and B and C
Fire Protection And Fire Safety Requirements : YES 80 COMMON FOR BUILDINGS A and B and C
Electrical Meter Room, Sub-Station, Receiving Station : YES 60 COMMON FOR BUILDINGS A and B and C
Aggregate area of recreational Open Space : YES 0 COMMON FOR BUILDINGS A and B and C
Open Parking : NO 0 NA
Water Supply : YES 80 COMMON FOR BUILDINGS A and B and C
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 80 COMMON FOR BUILDINGS A and B and C
Storm Water Drains : YES 75 COMMON FOR BUILDINGS A and B and C
Landscaping & Tree Planting : YES 0 COMMON FOR BUILDINGS A and B and C
Street Lighting : YES 30 COMMON FOR BUILDINGS A and B and C
Community Buildings : YES 90 COMMON FOR BUILDINGS A and B and C
Treatment And Disposal Of Sewage And Sullage Water : YES 0 COMMON FOR BUILDINGS A and B and C
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 ECO PARK ECO PARK WING B 31/12/2019 0 1 0 13 1 0 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 45.46 12 3
2 MHADA 35.17 10 0
3 MHADA 35.96 12 0
4 SHOP 13 2 0
5 1 BHK 31.73 12 9
6 1 BHK 36.63 24 16
7 2 BHK 45.35 20 7
8 REFUGE AREA 131.62 2 0
9 TERRACE 0.00 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 54.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 ECO PARK ECO PARK WING C 31/12/2019 0 1 0 13 1 0 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 45.46 22 17
2 SHOP 13 2 0
3 1 BHK 30.94 24 22
4 1 BHK 36.63 24 24
5 2 BHK 45.35 22 17
6 REFUGE AREA 131.62 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 88

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
PAVAN CONSTRUCTION-KETAN S PATEL NA Contractor
HEMANT VISHNU NIMBKAR NA Engineer
MAHENDRA THAKUR & ASSOCAITES NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other