MahaRERA Application

General Information

Other Than Individual

Organization

KARDA CONSTRUCTIONS LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

2ND FLOOR
GULMOHAR STATUS
DR MUNJE ROAD
SAMARTH NAGAR
ABOVE BUSINESS BANK
MAHARASHTRA
Nashik
Nashik
Nashik
Nashik
422005

Organization Contact Details

02532465436
www.kardaconstrutcion.com

Past Experience Details

Member Information

Member Name Designation Photo
Naresh Jagumal Karda Partner View Photo
NARESH JAGUMAL KARDA Authorized Signatory View Photo

Project

Hari Sanskruti Phase I
On-Going Project
31/03/2019
31/03/2019
No
Residential
No
S NO 248/2 TO 6/1,2,3,4 PART
APPROVED LAY OUT NO C-3-21 AND 12 MTRS WIDE ROAD
ADJ S NO 247 AND PROPOSED 60 MTRS D P ROAD
ADJ S NO 249
APPROVED LAYOUT NO 3-12
MAHARASHTRA
Nashik
Nashik
Nashik
Deolaligaon
422101
6873.28
2
2
0
687.33

FSI Details

0
12248.60
12248.60

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 69 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 70 Trimix road and paver blocks partly
Water Supply : YES 80 To be obtained from Nashik Municipal Corporation
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 70 STP as per approved plan
Storm Water Drains : YES 80 As per approved building plan
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 40 As per provisional NOC
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 35 As per approved building plan
Podium slab : YES 25 As per approved building plan
Community Buildings : YES 40 As per approved building plan
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA
Water Conservation, Rain water Harvesting : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Hari Sanskruti Phase I BUILDING E 31/03/2019 0 1 0 13 0 69 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 28.52 10 2
2 1BHK 32.65 1 1
3 1BHK 33.23 1 0
4 1BHK 33.28 5 4
5 1BHK 34.5 1 1
6 1BHK 34.51 12 2
7 1BHK 35.32 5 4
8 1BHK 35.38 1 1
9 1BHK 35.97 1 1
10 1BHK 36 5 4
11 1BHK 33.12 12 6
12 1BHK 33.66 5 2
13 1BHK 34.02 15 4
14 1BHK 34.48 30 18
15 1BHK 35.86 12 8
16 1BHK 34.65 12 6
17 1RK 34.65 12 6
18 1BHK 34.67 48 26
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 60
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 60
11 Overall Percentage of Completion of the work done For the entire Building /Wing 77
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Hari Sanskruti Phase I BUILDING D 31/03/2019 0 1 0 8 0 44 21
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 27.05 1 1
2 SHOP 28.70 8 7
3 SHOP 29.22 1 1
4 SHOP 34.01 1 1
5 SHOP 34.68 1 1
6 SHOP 34.77 2 2
7 2BHK 54.92 2 1
8 2BHK 55.81 1 1
9 3BHK 70.68 3 0
10 3BHK 70.71 5 1
11 3BHK 70.97 4 1
12 3BHK 71.05 7 0
13 3BHK 71.09 2 0
14 3BHK 71.13 1 0
15 3BHK 71.56 1 1
16 3BHK 73.07 2 1
17 3BHK 70.72 8 4
18 3BHK 70.98 7 1
19 3BHK 71.48 5 2
20 SHOP 28.96 1 1
21 SHOP 29.15 1 1
22 3BHK 70.72 8 0
23 3BHK 70.8 8 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 30
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 32

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Prashant Themaskar NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of Layout Approval (in case of layout)
Declaration in FORM B
Commencement Certificates
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Details of encumbrances
Proforma of the allotment letter and agreement for sale
Copy of the legal title report
Status of Conveyance
Certificates of Architect (Form 4)
Other
Certificates of CA (Form 5)
Status of Formation of Legal Entity (Society/Co Op etc.)