Do you have any Past Experience ?
No

Address Details

107
NA
NEW TIMBER MARKET
BHAWANI PETH
NA
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411002

Organization Contact Details

02040028000

Past Experience Details

Member Information

Member Name Designation Photo
RAHUL RAM MOHTA Authorized Signatory View Photo
VASANT KHANDU KATE Authorized Signatory View Photo
SUBHASH SHANTARAM SAKORE Partner View Photo

Project

Aarambh
On-Going Project
31/12/2019
31/12/2019
No
Residential
No
GAT NO. 215
GAT NO 212
GAT NO 216
GAT NO 212
FOREST BOUNDRY
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
412105
3641.23
2
2
0
0

FSI Details

0
5205.49
5205.49

Bank Details

INDUSIND BANK
INDB0000006

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 41 17 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 AS PER PCMC RULES
Energy management : YES 0 SOLAR WATER HEATING SYSTEM
Fire Protection And Fire Safety Requirements : YES 0 AS PER PROVISIONAL FIRE NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 AS PER CONSULTANT DRAWING
OTHER : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 -
Water Supply : YES 0 TO BE PROVIDED BY PCMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 AS PER PCMC RULES
Storm Water Drains : YES 0 AS PER CONSULTANT DRAWING
Landscaping & Tree Planting : YES 0 ALONG THE COMPOUND WALL
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 AS PER PCMC RULES
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Aarambh A 31/12/2019 0 1 0 10 0 20 21
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 31.046 8 8
2 2 BHK 43.193 10 9
3 1 BHK 31.403 1 1
4 1 BHK 30.393 1 1
5 2 BHK 41.273 8 8
6 2 BHK 43.282 8 8
7 1 BHK 29.750 8 8
8 2 BHK 41.342 7 7
9 1 BHK 30.740 9 9
10 1 BHK 30.027 7 7
11 1 BHK 29.759 1 1
12 1 BHK 29.255 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 44
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 24.4
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Aarambh B 31/12/2019 0 1 0 10 0 20 20
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 30.037 7 7
2 1 BHK 31.046 8 8
3 1 BHK 29.759 1 1
4 2 BHK 42.372 1 1
5 1 BHK 29.363 1 1
6 1 BHK 30.146 1 1
7 2 BHK 41.273 8 8
8 1 BHK 29.254 2 2
9 2 BHK 43.194 8 8
10 1 BHK 30.74 9 9
11 2 BHK 41.323 7 7
12 2 BHK 43.025 9 9
13 1 BHK 29.750 8 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 44
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 24.4

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
G A BHILARE NA Engineer
Vilas Yele NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Architect’s Certificate on Completion of Project (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other