MahaRERA Application

General Information

Other Than Individual

Organization

Jewel Builders and Infraprojects Ltd
Company
NA
Do you have any Past Experience ?
Yes

Address Details

SHOP NO 1
PUSHPAK APT
JAI MATA DI NAGAR
ULHASNAGAR
CHOPRA COURT
MAHARASHTRA
Konkan
Thane
Ulhasnagar
Ulhasnagar (M Corp.)
421003

Organization Contact Details

07770017462

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1jewel ekviraResidentialNA1950jewel ekvira near satyam heritage sector 10 kopra kharghar navi mumbai1691522016-07-092016-07-09

Member Information

Member Name Designation Photo
Jairaj Hiranand Kalyani Managing Director View Photo
Jairaj Hiranand Kalyani Authorized Signatory View Photo
Omprakash Hiranand Kalyani Authorized Signatory View Photo
JAIPRAKASH HIRANAND KALYANI Authorized Signatory View Photo

Project

jewel heaven phase 1
New Project
31/12/2020
No
Residential
No
Survey no 28/1B Hissa no 1
Adjoining Hissa
Adjoining Hissa
18M wide DP road
Adjoining Hissa
MAHARASHTRA
Konkan
Raigarh
Karjat
Bopele
Near Sai Mandir Neral
Neral
410101
1450
2
2
0
0

FSI Details

0
1636
1636.00

Bank Details

Bank of India
BKID0000045

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 106 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 Shall be done prior to OC
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Electric meter room shall be done prior to OC
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 Shall be done prior to OC
Water Supply : YES 0 MJP will give connection after OC is received
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 sewerage lines will be provided by ZP/Municipal
Storm Water Drains : YES 0 Shall be done prior to OC
Landscaping & Tree Planting : YES 0 Shall be done prior to OC
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 jewel heaven phase 1 A Wing 31/12/2021 0 1 0 5 1 0 53
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 shop 12.50 1 0
2 1bhk 27.55 7 1
3 1bhk 30.14 3 1
4 2bhk 36.14 4 1
5 shop 11.70 1 1
6 shop 13.50 2 2
7 1bhk 25.04 3 0
8 1bhk 25.38 4 0
9 shop 13.70 1 0
10 shop 10.95 1 0
11 shop 12.00 1 0
12 shop 7.70 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 jewel heaven phase 1 B WING 31/12/2021 0 1 0 5 1 0 53
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 12.50 1 0
2 SHOP 12.25 1 0
3 SHOP 10.70 1 0
4 SHOP 13.70 1 0
5 SHOP 7.70 1 0
6 1 BHK 27.08 3 0
7 1BHK 19.14 3 0
8 1BHK 19.62 3 0
9 1BHK 29.46 3 0
10 1BHK 30.14 4 0
11 1BHK 29.53 1 0
12 2BHK 35.32 4 1
13 SHOP 13.50 2 1
14 SHOP 11.70 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Prashant Jagtap NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other