MahaRERA Application

General Information

Other Than Individual

Organization

AARTI ESTATES
Partnership
NA
Do you have any Past Experience ?
No

Address Details

A 201
MANAS RESIDENCY
V.S.MARG
THANE WEST
NEAR TEEN PETROL PUMP
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400602

Organization Contact Details

02225381837

Past Experience Details

Member Information

Member Name Designation Photo
MANISH DEDHIA Authorized Signatory View Photo
Mukesh Dedhia Partner View Photo
DHIRAJ P DEDHIA Partner View Photo

Project

ACE HOMES
New Project
31/12/2021
No
Mixed (Plots & Buildings)
No
2/22 3/5
SURVEY NO 2 HISSA NO 32
SURVEY NO 3 HISSA NO 4
SURVEY NO 2 HISSA 23
20 M WIDE ROAD
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
LAKE ROAD
KASARVADAVALI
400615
3370
1
1
0
450.27

FSI Details

1386.64
6605.50
7992.14

Bank Details

HDFC BANK
HDFC0002504

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 114 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 Before OC
Energy management : YES 0 Solar Water Heating
Fire Protection And Fire Safety Requirements : YES 0 Before OC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Before OC
Fitness Center and Indoor Games : YES 30 Before OC
Aggregate area of recreational Open Space : YES 0 Before OC
Open Parking : YES 0 Before OC
Water Supply : YES 0 Will be provided by TMC after OC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Before OC
Storm Water Drains : YES 0 Before OC
Landscaping & Tree Planting : YES 0 Before OC
Street Lighting : YES 0 Internal compound lighting before OC
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 ACE HOMES Ace Homes 30/12/2021 0 1 0 20 1 1 114
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 40.51 1 1
2 Shop 31.77 2 2
3 Shop 49.50 1 1
4 Shop 26.12 2 2
5 1BHK 35.57 19 10
6 2BHK 47.56 16 10
7 1BHK 34.51 37 21
8 2BHK 44.96 38 6
9 1BHK 40.76 36 21
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

75
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 66

Plot Details

Number of Plots Area of Plot(In sqmts) Number of Plots Booked / Alloted / Sold
0 0 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Ar Subhash Gupte NA Architect
R C Tipnis NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other