MahaRERA Application

General Information

Other Than Individual

Organization

Prince Developers
Partnership
NA
Do you have any Past Experience ?
No

Address Details

1002
Golden Heights
Shastri Nagar
Lokhandwala Complex
Andheri West
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400053

Organization Contact Details

02227742108

Past Experience Details

Member Information

Member Name Designation Photo
Bhavesh Patel Partner View Photo
Manji Patel Partner View Photo
Jignesh Patel Partner View Photo
Kalpesh Patel Authorized Signatory View Photo

Project

Joy City
New Project
31/12/2021
No
Residential
No
129/1
S No 120 River
S No 128 132
S No 118 42 Ex road
S No 51 Pond
MAHARASHTRA
Konkan
Raigarh
Panvel
Shedung
Shedung
Panvel
410221
4300
6
6
0
0

FSI Details

0
7302.79
7302.79

Bank Details

HDFC Bank Rera Account
HDFC0000019

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 200 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Before Possession
Water Conservation, Rain water Harvesting : YES 0 Before Possession
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Before Possession
Aggregate area of recreational Open Space : YES 0 Before Possession
Open Parking : YES 0 Before Possession
Water Supply : YES 0 Before Possession
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Before Possession
Storm Water Drains : YES 0 Before Possession
Landscaping & Tree Planting : YES 0 Before Possession
Street Lighting : YES 0 Before Possession
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 0 Before Possession

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Joy City Building No 5 31/08/2020 0 1 0 5 1 30 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 41.29 2 0
2 2BHK 41.61 1 0
3 2BHK 41.96 2 0
4 2BHK 42.43 2 0
5 1BHK 29.71 2 0
6 1BHK 30.16 2 0
7 1BHK 30.26 2 0
8 2BHK 42.75 2 0
9 2BHK 43.53 2 0
10 2BHK 43.89 2 0
11 1BHK 28.66 1 0
12 1BHK 29.37 1 0
13 1BHK 29.41 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 18
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Joy City Building No 4 A and B Wing 31/03/2020 0 1 0 5 1 0 75
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 32.6 4 0
2 1BHK 27.94 2 0
3 1BHK 28.63 8 0
4 1BHK 29.40 4 0
5 1BHK 29.47 4 0
6 1BHK 29.78 4 0
7 1BHK 32.15 4 0
8 1BHK 29.81 2 0
9 1BHK 30.29 4 0
10 1BHK 30.38 4 0
11 1BHK 30.82 4 0
12 1BHK 31.33 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 80
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 18
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 Joy City Building no 2 31/12/2020 0 1 0 5 1 30 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 30.52 2 0
2 1BHK 31.12 2 0
3 1BHK 31.72 3 0
4 1RK 19.96 2 0
5 1RK 20.22 6 0
6 1RK 20.56 4 0
7 1RK 21.06 11 0
8 1BHK 33.25 1 0
9 1RK 20.76 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 60
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 16
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 Joy City Building No 3 31/12/2020 0 1 0 5 1 30 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 19.96 2 0
2 1RK 20.22 2 0
3 1RK 20.26 3 0
4 1RK 21.06 9 0
5 1BHK 28.04 1 0
6 1BHK 28.96 3 0
7 1BHK 30.52 3 0
8 1BHK 29.73 2 0
9 1RK 19.81 2 0
10 1RK 20.76 1 0
11 1RK 20.28 2 0
12 1BHK 28.54 1 0
13 1BHK 32.44 1 0
14 1BHK 32.47 1 0
15 1BHK 33.72 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 60
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 16
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 Joy City Building no 1 31/12/2020 0 1 0 5 1 30 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 IBHK 29.53 2 0
2 IBHK 28.96 3 0
3 IBHK 29.30 1 0
4 IBHK 30.40 3 0
5 1BHK 30.52 3 0
6 1RK 20.82 4 0
7 1BHK 29.73 2 0
8 IBHK 28.69 1 0
9 1BHK 28.55 1 0
10 1BHK 28.90 2 0
11 1BHK 27.80 1 0
12 IBHK 29.09 4 0
13 IBHK 28.24 2 0
14 IBHK 28.30 1 0
15 1BHK 29.62 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 Joy City Building No 6 31/03/2020 0 1 0 5 1 30 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 30.84 2 0
2 1BHK 29.46 4 0
3 1RK 20.57 2 0
4 1BHK 28.99 2 0
5 1RK 20.24 6 0
6 1BHK 29.34 4 0
7 1BHK 29.60 2 0
8 1RK 20.11 1 0
9 1BHK 29.73 1 0
10 1BHK 28.09 1 0
11 IRK 19.56 1 0
12 1BHK 30.52 2 0
13 1RK 20.42 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
AN ARCH NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other