MahaRERA Application

General Information

Other Than Individual

Organization

Labdhi Lifestyle Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

165 LOHAR CHAWL
AMRIT NIWAS
LOHAR CHAWL
MARINE LINES
NEAR ALPHALITE SHOWROOM
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
Mumbai City
400002

Organization Contact Details

02222002222
WWW.LABDHILIFE.COM

Past Experience Details

Member Information

Member Name Designation Photo
VIKAS JAIN Authorized Signatory View Photo
Mahendra M Jain Chairperson View Photo
AJAY SABOO Managing Director View Photo
HARSHAL M JAIN Authorized Signatory View Photo
LALITABEN K JAIN Authorized Signatory View Photo
KUNAL P JAIN Authorized Signatory View Photo

Project

LABDHI GARDENS PHASE 2
On-Going Project
31/05/2019
31/05/2019
No
Residential
No
81/1,2,3
Survey No 68 67
Survey No 71
Dahivali Vanjarpada ODR
Survey No 67
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
Mumbai City
Labdhi Gardens,Dahivali tarf varedi,Neral -Karjat
Neral
410101
9467
4
4
0
2140

FSI Details

0
6283.94
6283.94

Bank Details

ICICI BANK
ICIC0000261

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Concrete Roads
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Substations & Transformers
Swimming Pool : YES 100 Kids Pool & Adult Pool
Aggregate area of recreational Open Space : YES 100 Minor Landscaping in primises
Open Parking : YES 100 By the road side
Water Supply : YES 90 Treated Drinking Water Supply
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 Septic Tank
Storm Water Drains : YES 100 Concrete drains
Landscaping & Tree Planting : YES 100 As per landscape
Street Lighting : YES 100 Designer LED street lamps
Community Buildings : YES 100 Clubhouse
Treatment And Disposal Of Sewage And Sullage Water : YES 100 Proposed STP/Septic Tank
Solid Waste Management And Disposal : YES 100 As facilitated by local government body

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 LABDHI GARDENS PHASE 2 Petunia/ Qrimson 31/05/2019 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 PALACIO 25.90 2 2
2 ULTIMO 38.07 18 12
3 LUXURIA 31.01 20 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 LABDHI GARDENS PHASE 2 Rose/Tulip 31/05/2019 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 PALACIO 25.9 2 2
2 ULTIMO 38.07 18 12
3 LUXURIA 31.01 20 18
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 LABDHI GARDENS PHASE 2 Hyacinth 31/05/2019 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 EFFICIO 17.16 1 1
2 GRANDE 26.94 39 28
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 LABDHI GARDENS PHASE 2 Ivy 31/05/2019 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 EFFICIO 17.16 1 0
2 GRANDE 26.94 39 22
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
PREMNATH & ASSOCIATES NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other
Other
Other
Other