MahaRERA Application

General Information

Other Than Individual

Organization

Incline Realty Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

3rd Floor
Commerz
International Business Park
Goregaon East
Oberoi Garden City
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400063

Organization Contact Details

02266773333
www.oberoirealty.com

Past Experience Details

Member Information

Member Name Designation Photo
Saumil Daru Authorized Signatory View Photo
Rajendra Chandorkar Authorized Signatory View Photo
Rajesh Gaonkar Authorized Signatory View Photo

Project

Sky City Tower E
New Project
31/12/2023
Yes
Residential
No
CTS No 107 E of Village Magathane
CTS No 107 E pt of Village Magathane
CTS No 107 E pt of Village Magathane
CTS No 107 E pt of VIllage Magathane
CTS no 107 E pt of Village Magathane
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
Off Western Express Highway
Borivali
400066
866.30
1
1
0
0

FSI Details

5842
37158.56
43000.56

Bank Details

AXIS Bank
UTIB0000373

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) NA NA 0
Covered Parking ( In Numbers) 903 NA 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Will be provided
Water Conservation, Rain water Harvesting : YES 0 Will be provided
Energy management : YES 0 Will be provided
Fire Protection And Fire Safety Requirements : YES 0 Will be provided
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Will be provided as necessary
Prop Public Parking to be handed over to MCGM at any location in LargerProperty incl under RE Proj : YES 0 Approval in process
Aggregate area of recreational Open Space : YES 0 To be provided as per provisions of DCR
Open Parking : NO 0 NA
Water Supply : YES 0 Will be provided
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Will be provided
Storm Water Drains : YES 0 Will be provided
Landscaping & Tree Planting : YES 0 Will be provided
Street Lighting : YES 0 Will be provided
Community Buildings : YES 0 Common Clubhouse for all residential development
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Will be provided
Solid Waste Management And Disposal : YES 0 Will be provided

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Sky City Tower E Tower E 31/12/2023 3 1 8 66 2 0 903
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK Luxury Zone 1 99.71 181 0
2 3 BHK Luxury Zone 2 101.68 173 0
3 Luxury Duplex Zone 1 161.98 3 0
4 Luxury Duplex Zone 2 163.91 3 0
5 Prime 128.99 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 5
4 Stilt Floor 0
5 X number of Slabs of Super Structure 7
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 21.2

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Larsen & Toubro NA Contractor
Architect Sunil Arora NA Architect
WME Consultants NA Structural Engineer
TED Jacob ENgineering Group NA Other
The Boundary Layer Wind Tunnel Laboratory NA Other
Fortune Consultants Ltd NA Other
Goecon InternationalPte Ltd NA Other
En3 Sustainability Solutions Pvt Ltd NA Other

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Sky City Tower E Bombay High Court PIL No 48 Civil No Writ Petition 2017 Pending
NA
Sky City Tower E Small Causes Court Bandra LE Suit Number 84 Civil No Suit 2007 Pending
NA
Sky City Tower E Bombay City Civil Court Dindoshi Long Cause Suit No 1794 Civil No Suit 2016 Pending and ad interim relief sought by other party has been refused
NA

Uploaded Documents

Document Name Uploaded Document
Building Plan Approval (IOD)
Details of encumbrances
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Copy of the legal title report
Commencement Certificates
Copy of Layout Approval (in case of layout)
Proforma of the allotment letter and agreement for sale
Status of Conveyance
Certificates of Architect (Form 4)
Other
Status of Formation of Legal Entity (Society/Co Op etc.)