MahaRERA Application

General Information

Other Than Individual

Organization

PSC PROPERTIES PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

CTS NO 988
101 SOMNATH
RAM MANDIR ROAD
VILE PARLE EAST
NEAR TILAK MANDIR
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400057

Organization Contact Details

02039394949

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1GEETANJALI CHS LTDResidentialNA1135.30SHAHAJI RAJE MARG VILE PARLE EAST MUMBAI 400057252/12 PLOT NO 51352014-10-312014-12-29

Member Information

Member Name Designation Photo
VIKAS PRABHAKAR JOSHI Authorized Signatory View Photo
KAUSTUBH VILAS NIGUDKAR Authorized Signatory View Photo
UMESH SADASHIV KSHIRSAGAR Authorized Signatory View Photo

Project

PRAYOG
On-Going Project
31/03/2017
31/12/2018
Yes
Residential
No
CTS NO 2058 and 2074 FP NO 126 OF TPS V
WESTERN EXPRESS HIGHWAY
PRABHAT COLONY ROAD NO 2
CTS 2059 and 2073
RELIANCE ENERGY BUILDING
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
Road No.2
Andheri
400055
1836.10
2
2
0
276.43

FSI Details

0
4957.02
4957.02

Bank Details

AXIS BANK LTD
UTIB0001636

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 58 58 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 No Internal Roads only Driveway
Water Conservation, Rain water Harvesting : YES 100 -
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 -
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 -
Fitness Centre : YES 50 -
Terrace Garden : YES 60 -
Aggregate area of recreational Open Space : YES 100 -
Open Parking : NO 0 NA
Water Supply : YES 100 -
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 Sewage Line have been provided
Storm Water Drains : YES 100 -
Landscaping & Tree Planting : YES 60 -
Street Lighting : YES 100 Only building peripheral lighting
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 PRAYOG WING A 31/12/2017 0 1 0 8 1 0 26
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2.5BHK 75.95 2 2
2 2.5BHK 76.10 2 2
3 3BHK 77.12 2 2
4 3BHK 77.94 2 2
5 3BHK 77.37 2 2
6 3BHK 78.01 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

80
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 85
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 PRAYOG WING B 31/12/2017 0 1 0 8 1 0 32
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 66.19 4 4
2 2BHK 66.23 4 4
3 2BHK 66.39 5 5
4 2BHK 66.42 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

80
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 85

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Neha Enterprises NA Contractor
Sanjeev Patki NA Architect
J W Consultants NA Structural Engineer

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
PRAYOG Maharashtra Real Estate Regulatory Authority CC006000000055356 Others No Other 2018 Both the parties sough to settle the matter amicably Next date is Twenty one September two thousan
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other