MahaRERA Application

General Information

Other Than Individual

Organization

EMPERIA REALTY
Partnership
NA
Do you have any Past Experience ?
No

Address Details

C-4
MON BIJOU
ABHYUDAYA BANK MARG
SECTOR - 17
AGARWAL CHOWK
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400703

Organization Contact Details

02227666003
www.emperiadevelopers.com

Past Experience Details

Member Information

Member Name Designation Photo
DANJI DEVA DAKA Partner View Photo
DHIRAJ SAVJIBHAI MANJERI Partner View Photo
GOVIND MEGHJI PATEL Partner View Photo
KISHORE BACHUBHAI MUJAT Partner View Photo
RAMESH KANJI ARETHIYA Partner View Photo
DHIRAJ SAVJIBHAI MAJERI Authorized Signatory View Photo
RAJENDRAKUMAR RAMESHBHAI CHAUDHARY Partner View Photo

Project

AKSHAR EMPERIA GARDEN
On-Going Project
31/12/2019
31/12/2022
No
Residential
No
SURVEY NO- 22, KARADE KHURD, RASAYANI, PANVEL
GAT NO 25
GAT NO 21 23 25
GAT NO 25
ROAD AND GAT NO 25
MAHARASHTRA
Konkan
Raigarh
Panvel
Karade Kh.
BEHIND ANTONY GARAGE
RASAYANI PATALGANGA
410206
9000
4
4
0
896.4

FSI Details

0
9583.48
9583.48

Bank Details

BANK OF BARODA
BARB0VASHIX

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 WORK YET TO BE COMMENCE
Water Conservation, Rain water Harvesting : YES 0 WORK YET TO BE COMMENCE
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 WORK YET TO BE COMMENCE
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 WORK YET TO BE COMMENCE
Aggregate area of recreational Open Space : YES 0 WORK YET TO BE COMMENCE
Open Parking : NO 0 NA
Water Supply : YES 0 WORK YET TO BE COMMENCE
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 WORK YET TO BE COMMENCE
Storm Water Drains : YES 0 WORK YET TO BE COMMENCE
Landscaping & Tree Planting : YES 0 WORK YET TO BE COMMENCE
Street Lighting : YES 0 WORK YET TO BE COMMENCE
Community Buildings : YES 0 WORK YET TO BE COMMENCE
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 0 WORK YET TO BE COMMENCE

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 AKSHAR EMPERIA GARDEN ORCHID 31/12/2022 0 1 0 8 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 RK 17.12 7 2
2 1 RK 17.69 7 7
3 1 BHK 24.72 56 24
4 1 BHK 24.96 7 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 50
5 X number of Slabs of Super Structure 60
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 27
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 AKSHAR EMPERIA GARDEN ROSE 31/12/2022 0 1 0 8 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 RK 17.12 14 12
2 1 RK 17.69 7 5
3 1 BHK 24.72 49 30
4 1 BHK 26.51 7 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 50
5 X number of Slabs of Super Structure 60
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 27
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 AKSHAR EMPERIA GARDEN TULIP 31/12/2022 0 1 0 8 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 RK 17.12 14 8
2 1 RK 17.69 7 5
3 1 BHK 24.72 49 19
4 1 BHK 26.51 7 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 10
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 AKSHAR EMPERIA GARDEN ASTER 31/12/2022 0 1 0 8 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 24.96 7 0
2 1 RK 17.12 7 4
3 1 RK 17.69 7 3
4 1 BHK 24.72 56 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 10

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
RAYYAN ANWAR TUNGEKAR A52000003477 Real Estate Agent
AMOL NANDA KUMBHAR A51700003920 Real Estate Agent
VIMAL CONSTRUCTION NA Contractor
DHARM STRUCT-CON NA Contractor
AN.ARCH NA Architect
B.S SUKTHANKAR & ASSOCIATES NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Details of encumbrances
Commencement Certificates
Copy of the legal title report
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Conveyance
Certificates of Architect (Form 4)
Other
Status of Formation of Legal Entity (Society/Co Op etc.)