MahaRERA Application

General Information

Other Than Individual

Organization

SHUBHAM ASSOCIATES
Partnership
NA
Do you have any Past Experience ?
No

Address Details

S NO 257/1/2
FLORENCIA
NEAR PCMC SCHOOL
WAKAD
KASPATE VASTI
MAHARASHTRA
Pune
Pune
Mulshi
Wakad
411057

Organization Contact Details

02064101567

Past Experience Details

Member Information

Member Name Designation Photo
SOHANLAL SHANKARLAL VISHNOI Partner View Photo
RAJU SHAMANDAS ASWANI Partner View Photo
SRICHAND SHAMANDAS ASWANI Partner View Photo
SOHANLAL SHANKARLAL VISHNOI Authorized Signatory View Photo
ANIL SHAMANDAS ASWANI Partner View Photo
SATISH SHAMANDAS ASWANI Partner View Photo
HARI NICHALDAS JESWANI Partner View Photo

Project

FLORENCIA PHASE 1
On-Going Project
18/07/2020
18/07/2020
No
Residential
No
S NO 257/1/2, 258P, KASPATE VASTI NEAR PCMC SCHOOL, WAKAD
SR NO 258
24 MTR WIDE ROAD
BHARAT KASPATE PROPERTY
SR NO 257 P
MAHARASHTRA
Pune
Pune
Mulshi
Wakad
Wakad
Wakad
411057
10880
4
4
0
1088

FSI Details

0
17984.65
17984.65

Bank Details

PUNJAB AND MAHARASHTRA COOPERATIVE BANK LTD
PMCB0000243

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 228 207 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 DONE
Water Conservation, Rain water Harvesting : YES 100 DONE
Energy management : YES 100 SOLAR WATER HEATING SYSTEM
Fire Protection And Fire Safety Requirements : YES 100 DONE
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 DONE
Aggregate area of recreational Open Space : YES 100 DONE
Open Parking : YES 100 DONE
Water Supply : YES 100 PCMC WATER CONNECTION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 DONE
Storm Water Drains : YES 100 CONNECTED PCMC LINE
Landscaping & Tree Planting : YES 55 IN PROGRESS
Street Lighting : YES 100 DONE
Community Buildings : YES 100 DONE
Treatment And Disposal Of Sewage And Sullage Water : YES 100 DONE
Solid Waste Management And Disposal : YES 100 DONE

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 FLORENCIA PHASE 1 A 0 1 1 13 0 14 57
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 56.85 6 4
2 2BHK 57.10 6 3
3 2BHK 57.14 35 24
4 2BHK 58.95 6 2
5 2BHK 58.97 6 4
6 2BHK 59.51 5 3
7 2BHK 59.83 6 4
8 3BHK 83.90 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 FLORENCIA PHASE 1 B 1 1 0 13 0 12 57
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 56.85 6 4
2 2BHK 57.10 6 4
3 2BHK 57.12 5 5
4 2BHK 57.14 30 23
5 2BHK 58.95 5 3
6 2BHK 58.97 6 5
7 2BHK 59.51 5 3
8 2BHK 59.83 6 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 FLORENCIA PHASE 1 C 0 1 1 13 0 13 57
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 56.85 6 5
2 2BHK 57.10 6 5
3 2BHK 57.14 35 33
4 2BHK 58.95 5 4
5 2BHK 58.97 6 6
6 2BHK 59.51 5 4
7 2BHK 59.83 6 6
8 3BHK 83.90 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 FLORENCIA PHASE 1 D 0 1 1 13 0 13 57
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 56.85 6 6
2 2BHK 57.10 6 5
3 2BHK 57.12 5 5
4 2BHK 57.14 30 28
5 2BHK 58.87 1 1
6 2BHK 58.95 6 4
7 2BHK 58.97 5 5
8 2BHK 59.51 5 4
9 2BHK 59.83 6 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SACHIN SUTAR NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other