MahaRERA Application

General Information

Other Than Individual

Organization

STATUS CONSTRUCTION PVT LTD
Company
NA
Do you have any Past Experience ?
No

Address Details

103
SANKALP APARTMENT
JANKALYAN ROAD
JANKALYAN NAGAR
MARVE ROAD FIRE STATION
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400095

Organization Contact Details

02228638236

Past Experience Details

Member Information

Member Name Designation Photo
Vishesh Mukesh Garg Authorized Signatory View Photo
Mukesh Motilal Garg Authorized Signatory View Photo

Project

SANKALP HEIGHTS 1-22
On-Going Project
31/12/2017
31/12/2022
Yes
Residential
No
CTS NO 50
CTS NO 43A
SURVEY NO 86 HISSA NO 16 AND 22 AND 34
CTS NO 39
SURVEY NO 85 HISSA NO 9
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
Jankalyan Nagar
Malad (W)
400095
1950.10
2
1
1
292.54

FSI Details

3162
2630.90
5792.90

Bank Details

HDFC BANK
HDFC0000321

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 110 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 98 AS PER FIRE NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 95 AS PER MCGM
Aggregate area of recreational Open Space : YES 0 292.54 SQ MT OF PAVED RG AS APPROVED BY MCGM
Open Parking : NO 0 NA
Water Supply : YES 0 WILL BE PROVIDED BY MCGM
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 98 UNDERGROUND SEWERAGE AS PER MCGM APPROVAL
Storm Water Drains : YES 98 UNDERGROUND AS PER MCGM APPROVAL
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SANKALP HEIGHTS 1-22 PART A 1-10 0 01 0 11 01 0 50
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 95.22 10 9
2 2BHK 72.52 20 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 95
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 98
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

98
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
11 Overall Percentage of Completion of the work done For the entire Building /Wing 88.4
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 SANKALP HEIGHTS 1-22 PART B 11-22 0 01 0 12 01 0 60
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 95.22 12 0
2 2BHK 72.52 24 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 60
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 26

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
V V & ASSOCIATES NA Architect
VIKAS PANDURANG KUSHE A51900002617 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
SANKALP HEIGHTS 1-22 CITY CIVIL COURT DINDOSHI GOREGAON 3133 Civil No Suit 2003 PENDING
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other