MahaRERA Application

General Information

Individual

Individual

VISHAL
DUTT
SHRI RAMKRISHNA SHARMA
Yes

Address For Official Communication

B-205
BIG SPLASH
SECTOR 17
VASHI
NEAR BUS DEPOT
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400703

Contact Details

02227895463
www.sohamtownship.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1VASANTNAGARResidentialNA2800VILLAGE NEVALI TALUKA PANVEL DIST. RAIGAD 41020613641998-12-312009-04-02

Project

SOHAM RESIDENCY
On-Going Project
31/12/2015
31/12/2017
No
Residential
No
47
11 MTRS WIDE ROAD
MIDC LAND
PLOT NO 48
PLOT NO 43
MAHARASHTRA
Konkan
Raigarh
Panvel
Kharghar
410210
1399.63
1
1
0
0

FSI Details

0
2099.45
2099.45

Bank Details

PUNJAB NATIONAL BANK
PUNB0350200

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 19 0 88

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 COMPLIED WITH
Energy management : NO 0 PENDING FOR FINAL APPROVAL
Fire Protection And Fire Safety Requirements : YES 95 APPLIED TO CFO FOR WORK COMPLETION CERTIFICATE
Electrical Meter Room, Sub-Station, Receiving Station : YES 95 PENDING FOR APPROVAL
Aggregate area of recreational Open Space : NO 0 APPROVAL RECEIVED
Open Parking : YES 95 METERS TO BE INSTALLED AFTER OC
Water Supply : YES 95 PIPEPLINE WORK COMPLETED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 CIDCO SUPPLY PENDING
Storm Water Drains : YES 100 ALL APPROVALS RECEIVED
Landscaping & Tree Planting : YES 100 ALL APPROVALS RECEIVED
Street Lighting : NO 0 PENDING FOR TREE NOC
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 DRAINAGE COMPLETION CERTIFICATE OBTAINED
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SOHAM RESIDENCY SOHAM RESIDENCY 0 1 0 8 1 16 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 COMMERCIAL 269.46 6 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 95
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

95
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
YASH NIRMAM ENGINEERS AND CONTRACTORS NA Contractor
BUREAU D ARCHITECTURE NA Architect
G N SYSTECH CONSULTING ENGINEERS PRIVATE LIMITED NA Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other