MahaRERA Application

General Information

Other Than Individual

Organization

KARMAA REALTY
Partnership
NA
Do you have any Past Experience ?
No

Address Details

210
OBEROI CHAMBERS II
OFF NEW LINK ROAD
ANDHERI WEST
BEHIND HOME TOWN BUILDING
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400053

Organization Contact Details

02265278921
www.karmaagroup.com

Past Experience Details

Member Information

Member Name Designation Photo
VINOD MADANLAL TALWAR Partner View Photo
YASH VINOD TALWAR Authorized Signatory View Photo
CHANDRA VINOD TALWAR Partner View Photo
SUNIL GUPTA Partner View Photo
KAVITA SUNIL GUPTA Partner View Photo

Project

KARMAA GALAXY
On-Going Project
01/08/2017
31/12/2017
No
Residential
No
400/5/1,2,6,7,8
Plot No 400-6
Colony Road
Plot No 400-3
18M Road
MAHARASHTRA
Nashik
Nashik
Nashik
Nashik (M Corp.)
422011
17675
3
2
1
1567.5

FSI Details

25163
19024
44187.00

Bank Details

Axis Bank
UTIB0000020

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 53 38 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Provided as Per Plan
Water Conservation, Rain water Harvesting : YES 100 Pits in Storm Water drains
Energy management : YES 100 LED Lights installed in common area
Fire Protection And Fire Safety Requirements : YES 100 Fire NOC received
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 All Meter rooms and Sub Station Setup
Aggregate area of recreational Open Space : YES 100 1550 Sq. M.
Open Parking : YES 100 Paving and demarcation done
Water Supply : YES 100 Received NMC Supply
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 All I.C. and connections are established
Storm Water Drains : YES 100 Storm Water Drains Constructed for Phase I
Landscaping & Tree Planting : YES 100 Planting of Trees according to Municipal By Laws
Street Lighting : YES 100 Compound LIghting
Community Buildings : YES 90 Club House in Project
Treatment And Disposal Of Sewage And Sullage Water : YES 100 STP Constructed
Solid Waste Management And Disposal : YES 100 SWM Pits are constructed

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 KARMAA GALAXY Tower III 0 1 0 12 1 14 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 100.1 22 15
2 3BHK 151.19 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 90
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 88
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 KARMAA GALAXY Tower I 31/12/2017 0 1 0 12 1 111 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 68.45 12 10
2 2.5BHK 71.79 12 9
3 3BHK 87.21 12 7
4 2BHK 66.66 12 11
5 2BHK 67.55 11 10
6 2BHK 67.04 11 9
7 2.5BHK 75.11 12 6
8 2.5BHK 74.78 12 5
9 2.5BHK 71.90 11 5
10 3BHK 86.81 12 4
11 3BHK 85.49 12 4
12 3BHK 87.47 12 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 KARMAA GALAXY Tower II Phase II 0 1 0 2 1 111 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 68.45 8 0
2 2.5BHK 71.79 8 0
3 3BHK 86 8 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Rupali and Vivek Jaykhedkar Architects NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Declaration in FORM B
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates
Copy of Layout Approval (in case of layout)
Copy of the legal title report
Proforma of the allotment letter and agreement for sale
Details of encumbrances
Certificates of Architect (Form 4)
Status of Conveyance
Other
Status of Formation of Legal Entity (Society/Co Op etc.)