MahaRERA Application

General Information

Other Than Individual

Organization

RajHeramb Landmarks
Partnership
NA
Do you have any Past Experience ?
No

Address Details

Row House No-3
Rajvimal Terraces
Plot No-28,Ramagar Colony
Bavdhan
NDA Road
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411021

Organization Contact Details

02066521616

Past Experience Details

Member Information

Member Name Designation Photo
Pravin Vishwanath Patil Partner View Photo
Pravin Vishwanath Patil Authorized Signatory View Photo
Madhuri Pravin Patil Partner View Photo
Heramb Pravin Patil Partner View Photo

Project

1 Nere Residency
On-Going Project
31/05/2018
31/12/2018
31/12/2019
Yes
Residential
No
Survey No 119 2 Nere Tal Mulshi Dist Pune
Survey No 95
15 meter wide Road
Survey No 119 2 PART
Survey No 119 2 PART
MAHARASHTRA
Pune
Pune
Mulshi
Nere
NERE
NERE
412306
7132.89
2
2
0
919.70

FSI Details

2124.17
8001.21
10125.38

Bank Details

ICICI Bank
ICIC0001876

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 64 32 50

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Yet To Start
Water Conservation, Rain water Harvesting : YES 0 Yet To Start
Energy management : YES 0 Yet To Start
Fire Protection And Fire Safety Requirements : YES 0 Yet To Start
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Yet To Start
Aggregate area of recreational Open Space : YES 0 Yet To Start
Open Parking : YES 0 Yet To Start
Water Supply : YES 0 Yet To Start
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 40 Yet To Start
Storm Water Drains : YES 25 Yet To Start
Landscaping & Tree Planting : YES 0 Yet To Start
Street Lighting : YES 0 Yet To Start
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Yet To Start
Solid Waste Management And Disposal : YES 0 Yet To Start

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 1 Nere Residency A 31/12/2018 0 1 0 9 1 45 40
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 32.81 8 4
2 2 BHK 44.94 8 8
3 1 BHK 37.13 14 3
4 2 BHK 41.81 8 8
5 2 BHK 46.92 8 6
6 2 BHK 43.79 8 8
7 1 BHK 35.35 16 6
8 1 BHK 34.41 8 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 57
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 1 Nere Residency B 31/12/2018 0 1 0 12 1 20 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK 79.24 22 22
2 2 BHK 57.03 21 19
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 50

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Nikunj Investments and Home Solutions A52100002995 Real Estate Agent
Ardecon Consultants Mr Mandar Ghate NA Architect
Spectrum Consultants Mr Parag Chopda NA Structural Engineer

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
1 Nere Residency Pune District Court 146/2018 Civil Yes Suit 2018 Ongoing

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Details of encumbrances
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other
Other