MahaRERA Application

General Information

Other Than Individual

Organization

MATRUCHHAYA DEVELOPERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

OFFICE NO 1,2,3 AND 4
BUILDING NO 14
PAMTEMBHI
NEXT TO MIDC NAVAPUR ROAD
BOISAR
MAHARASHTRA
Konkan
Palghar
Palghar
Boisar
401501

Organization Contact Details

02227583686

Past Experience Details

Member Information

Member Name Designation Photo
HARILAL BHACHU VERAT Authorized Signatory View Photo
HARILAL BHACHU VERAT Partner View Photo
SHAMJI MURABHAI VERAT Partner View Photo
HARJI GOVIND PATEL Partner View Photo
BHARAT MURA VERAT Partner View Photo
DEVRAJ BHACHU VERAT Partner View Photo

Project

MATRUCHHAYA HEIGHTS
New Project
30/11/2022
No
Others
No
33/1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19 75/2 27/1APT,1BPT,1CPT,1/1APT,27/3,5A,B,6,7 32/34
LAYOUT ROAD
SURVEY NO 21
BUILDING NO 15
LAYOUT ROAD
MAHARASHTRA
Konkan
Palghar
Palghar
pam
VILLAGE PAM TEMBHI
TALUKA PALGHAR
401501
6510.80
7
7
0
0

FSI Details

0
4883.10
4883.10

Bank Details

GREATER BANK
GBCB0000010

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 28 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 30 WORK IN PROCESS
Water Conservation, Rain water Harvesting : YES 0 RAIN WATER HARVESTING TO BE PROVIDED
Energy management : YES 0 YET TO BE PROVIDED
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 YET TO BE PROVIDED
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 100 BOREWELL HAS BEEN PROVIDED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 SEWERAGE TO BE PROVIDED
Storm Water Drains : YES 0 STORM WATER DRAINS TO BE PROVIDED
Landscaping & Tree Planting : YES 0 0
Street Lighting : YES 10 WORK IN PROCESS
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 YET TO BE PROVIDED
Solid Waste Management And Disposal : YES 0 YET TO BE PROVIDED

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 MATRUCHHAYA HEIGHTS A WING 31/05/2020 0 1 0 4 0 2 4
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 10.60 2 0
2 SHOP 8.31 2 0
3 SHOP 16.07 2 0
4 SHOP 7.02 1 0
5 RESIDENTIAL 28.04 6 0
6 RESIDENTIAL 28.03 3 0
7 RESIDENTIAL 35.75 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 75
3 X number of Podiums 0
4 Stilt Floor 25
5 X number of Slabs of Super Structure 15
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 22.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 MATRUCHHAYA HEIGHTS B WING 31/05/2020 0 1 0 4 0 4 2
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 10.60 2 0
2 SHOP 8.31 2 0
3 SHOP 16.07 2 0
4 SHOP 7.02 1 0
5 RESIDENTIAL 28.04 6 0
6 RESIDENTIAL 28.03 3 0
7 RESIDENTIAL 35.75 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 75
3 X number of Podiums 0
4 Stilt Floor 25
5 X number of Slabs of Super Structure 15
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 22.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 MATRUCHHAYA HEIGHTS C WING 31/05/2022 0 1 0 4 0 2 4
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 24.25 1 0
2 SHOP 14.04 2 0
3 SHOP 10.98 1 0
4 SHOP 13.63 1 0
5 SHOP 9.56 1 0
6 SHOP 12.22 1 0
7 RESIDENTIAL 32.08 1 0
8 RESIDENTIAL 32.06 1 0
9 RESIDENTIAL 28.03 12 0
10 RESIDENTIAL 28.01 3 0
11 RESIDENTIAL 40.86 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 MATRUCHHAYA HEIGHTS D WING 31/05/2022 0 1 0 4 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 32.08 1 0
2 RESIDENTIAL 39.80 1 0
3 RESIDENTIAL 28.04 6 0
4 RESIDENTIAL 28.03 3 0
5 RESIDENTIAL 35.75 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 MATRUCHHAYA HEIGHTS E WING 31/05/2022 0 1 0 4 0 2 4
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 32.08 2 0
2 RESIDENTIAL 32.06 1 0
3 RESIDENTIAL 46.94 1 0
4 RESIDENTIAL 28.03 12 0
5 RESIDENTIAL 28.01 3 0
6 RESIDENTIAL 40.86 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 MATRUCHHAYA HEIGHTS F WING 31/05/2022 0 1 0 4 0 2 4
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 32.08 1 0
2 RESIDENTIAL 39.80 1 0
3 RESIDENTIAL 28.04 6 0
4 RESIDENTIAL 28.03 3 0
5 RESIDENTIAL 35.75 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 MATRUCHHAYA HEIGHTS G WING 31/05/2022 0 1 0 4 0 2 4
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 21.45 1 0
2 SHOP 16.75 1 0
3 SHOP 22.87 1 0
4 SHOP 18.16 1 0
5 SHOP 23.28 2 0
6 SHOP 40.16 1 0
7 RESIDENTIAL 32.08 1 0
8 RESIDENTIAL 32.06 1 0
9 RESIDENTIAL 28.03 12 0
10 RESIDENTIAL 28.01 3 0
11 RESIDENTIAL 40.86 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
NISHANT PATIL NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other