MahaRERA Application

General Information

Other Than Individual

Organization

RAVIRAJ VENTURES
Partnership
NA
Do you have any Past Experience ?
Yes

Address Details

614
AARADHNA BUILDING
PALKHI CHOWK
NANA PETH
OPP. PARSI AGYARI
MAHARASHTRA
Pune
Pune
Haveli
Peth
411002

Organization Contact Details

02026164436

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1AUREATEResidentialNA5077SR NO 76 PART P CTS 1078 P 1080 P 1089P PIMPLE SAUDAGARSR NO 76 PART P CTS 1078 P 1080 P 1089P6842017-07-282017-07-28

Member Information

Member Name Designation Photo
YOGESH ISHWARLAL SAKLA Partner View Photo
RAVINDRA NAUPATLAL SAKLA Partner View Photo
RAVINDRA NAUPATLAL SAKLA Authorized Signatory View Photo

Project

AUREATE - PHASE 2
On-Going Project
31/03/2018
2018-03-31
31/08/2018
No
Residential
No
S.NO 76 P , CTS NO, 1078 P ,1080 ,P 1088 P, 1089 P
CTS 1078 P
CTS1089 P
CTS NO 767
F BUILDING
MAHARASHTRA
Pune
Pune
Haveli
Pimpale Saudagar
411027
1619
2
2
0
675

FSI Details

0.00
3085.99
3085.99

Bank Details

INDIAN BANK
IDIB000N012

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 24 2 50

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 60 WBM (Metalling and Murum laying with compaction)
Water Conservation, Rain water Harvesting : YES 100 As per Drainage NOC
Energy management : YES 70 NA
Fire Protection And Fire Safety Requirements : YES 70 As per Consultants
Electrical Meter Room, Sub-Station, Receiving Station : YES 70 Solar Water Heater
Aggregate area of recreational Open Space : YES 20 As per Fire NOC Norms
Open Parking : YES 70 As per MSEB Norms
Water Supply : YES 90 UGWT
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 70 STP
Storm Water Drains : YES 70 SepticTank
Landscaping & Tree Planting : YES 0 Chambers
Street Lighting : YES 0 As per Water NOC Norms
Community Buildings : YES 20 As per Garden NOC Norms
Treatment And Disposal Of Sewage And Sullage Water : YES 70 As per Consultant Drawings
Solid Waste Management And Disposal : NO 0 Club House

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 AUREATE - PHASE 2 BUILDING -G 31/08/2018 0 1 0 8 0 4 11
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 60.78 1 0
2 3BHK 73.18 6 2
3 2BHK 57.64 1 1
4 2BHK 61.61 3 1
5 2BHK 58.03 3 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 70
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 36
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 98
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

39
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 13
11 Overall Percentage of Completion of the work done For the entire Building /Wing 47.1
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 AUREATE - PHASE 2 BUILDING-H 0 1 0 8 0 5 13
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 60.78 1 0
2 2BHK 58.03 3 0
3 2BHK 61.61 3 0
4 3BHK 70.75 7 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 70
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

10
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 41.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SOLESPACE NA Architect
Ms Spectrum Consultants NA Structural Engineer
NAYANA ROUT NA Contractor
PARAMOUNT CREATIONS NA Contractor
RAMLU YARAPPA DHANGAR NA Contractor
SHREYASH WATERPROOFING NA Contractor
HARI OM CONSTRUCTION NA Contractor
SHREE SAI ELECTRICALS NA Contractor
OM SAI CONSTRUCTION NA Contractor
PRAMILA ROUT NA Contractor
BALAJI STEEL FABRICATION NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other