General Information

Other Than Individual

Organization

J M G REALTORS PVT LTD
Company
NA
Do you have any Past Experience ?
No

Address Details

28
RAJA BAHADUR BUILDING
MUMBAI SAMACHAR MARG
FORT
NEAR BSE
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
Mumbai City
400023

Organization Contact Details

02266236300

Past Experience Details

Member Information

Member Name Designation Photo
NARINDERPAL ROSHANLAL GUPTA Authorized Signatory View Photo
NARINDERPAL ROSHANLAL GUPTA Chairperson View Photo

Project

N G SHREE RAM VAN PHASE II
New Project
30/09/2020
No
Residential
No
Survey No.2, Hissa No. 1, New Survey No. 1,2,8,9,,16, 230 to 234, 236 to 246, 251,270, 272 to 276
12 METER WIDE INTERNAL ROAD
BLDG NO 42 BLDG NO 43
ACHOLE POLICE STATION
12 METER WIDE INTERNAL ROAD
MAHARASHTRA
Konkan
Palghar
Vasai
Vasai-Virar City (M Corp)
ACHOLE
VASAI EAST
401208
3223.54
2
2
0
483.53

FSI Details

40484.70
3223.54
43708.24

Bank Details

KOTAK MAHINDRA BANK
KKBK0000957

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 12 0 80

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 90 WORK IN PROGRESS
Water Conservation, Rain water Harvesting : YES 0 WORK IN PROGRESS
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 WORK IN PROGRESS
Electrical Meter Room, Sub-Station, Receiving Station : YES 50 WORK IN PROGRESS
Aggregate area of recreational Open Space : YES 50 WORK IN PROGRESS
Open Parking : NO 0 NA
Water Supply : YES 0 WORK IN PROGRESS
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 WORK IN PROGRESS
Storm Water Drains : YES 10 WORK IN PROGRESS
Landscaping & Tree Planting : YES 20 WORK IN PROGRESS
Street Lighting : YES 20 WORK IN PROGRESS
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 N G SHREE RAM VAN PHASE II N G SHREE RAM VAN HB 44 31/03/2020 0 1 0 8 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK TYPE 1 35.52 14 0
2 1 BHK TYPE 2 36.52 14 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 55
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 N G SHREE RAM VAN PHASE II N G SHREE RAM VAN HA 46 31/03/2020 0 1 0 8 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK TYPE 1 53.3 14 0
2 2 BHK TYPE 2 52.63 14 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

40
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 54

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SHAH GHATTANI CONSULTANTS DIVYESH SHAH NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other