MahaRERA Application

General Information

Other Than Individual

Organization

Kedar Developers
Partnership
NA
Do you have any Past Experience ?
No

Address Details

Shop No LG 12
C1
Oxigen Vally
At Post Manjari Farm
Oxigen Vally
MAHARASHTRA
Pune
Pune
Haveli
MANJARI Bk
412307

Organization Contact Details

02024455643

Past Experience Details

Member Information

Member Name Designation Photo
Shivraj Babanrao Ghule Partner View Photo
Namdev Krushna Patil Partner View Photo
Namdev Krushna Patil Authorized Signatory View Photo
Sulabha Dattajirao Desai Partner View Photo
Amit Bhanudas Londhe Partner View Photo
Visahal Vishwanath Shewale Partner View Photo

Project

Shivalay
On-Going Project
30/10/2020
30/04/2021
No
Residential
No
Survey No 392/2 Plot No 3
Amenity Shopping
Open Space
Survey No 392 remaining part
9 Mtr Wide Road
MAHARASHTRA
Pune
Pune
Haveli
MANJARI Bk
412307
1822.42
2
2
0
870

FSI Details

364.48
1822.42
2186.90

Bank Details

Janseva Sahkari Bank Ltd Pune
JANA0000016

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 32 9 60

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 75 0
Water Conservation, Rain water Harvesting : YES 0 0
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 80 0
Aggregate area of recreational Open Space : YES 60 0
Open Parking : YES 0 0
Water Supply : YES 60 0
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 0
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 100 0
Street Lighting : NO 0 NA
Community Buildings : YES 100 0
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Shivalay C 30/04/2021 0 1 0 5 0 10 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 44.37 4 0
2 2BHK 43.92 4 3
3 2BHK 41.60 4 2
4 2BHK 40.81 4 2
5 2BHK 44.27 4 2
6 2BHK 42.84 4 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 52
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Shivalay D 30/04/2021 0 0 0 5 0 10 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 30.61 4 3
2 1BHK 30.56 8 4
3 1BHK 31.15 4 3
4 1BHK 32.60 2 1
5 1BHK 34.00 4 1
6 1BHK 32.71 2 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 52

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Gauri Construction NA Contractor
Amod A Doshi NA Architect
Santosh S Patil NA Structural Engineer
Mangesh M Shende NA
Kamlesh M Pisal NA

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Other