MahaRERA Application

General Information

Other Than Individual

Organization

NEELKAMAL REALTORS SUBURBAN PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

Nil
DB House
General A. K. Vaidya Marg
Goregaon East
Opposite Dindoshi Bus Depot
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400063

Organization Contact Details

02240778638
www.dbrealty.co.in

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1DB Ozone - MumbaiResidentialNA673.28Village Dahisar Near Dahisar Check Naka Mumbai 4000683113D12402015-12-312022-12-31

Member Information

Member Name Designation Photo
Rajiv Batekrishna Agarwal Authorized Signatory View Photo
Asif Yusuf Balwa Authorized Signatory View Photo

Project

DB Ozone
On-Going Project
31/12/2015
31/12/2019
Yes
Residential
No
4509 - 4513,4517,4547,4548,4572-4575,4604,4609-4611,4652,4691,4692,4702,4710-4721, 4724-4732
Sanjay Gandhi National Park
National Highway No 8
Thakur Mall and International school
Dahisar Boundary CTS No 3113D
MAHARASHTRA
Konkan
Thane
Thane
Mira-Bhayandar (M Corp.)
401202
38400.60
25
25
0
4739.67

FSI Details

3144
161994
165138.00

Bank Details

YES Bank Limited
YESB0000001

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) NA 0 0
Covered Parking ( In Numbers) 1563 1563 90

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 50 Minimum 6m road width
Water Conservation, Rain water Harvesting : YES 0 Rainwater harvesting tanks
Energy management : YES 18 Power supply through utility provider
Fire Protection And Fire Safety Requirements : YES 0 As per CFO
Electrical Meter Room, Sub-Station, Receiving Station : YES 10 MBMC and NBC Norms
Other facilities : YES 0 Clubhouse & swimming pool
Aggregate area of recreational Open Space : YES 0 Meter Room and sub-station & Receiving stations
Open Parking : NO 0 Landscaped
Water Supply : YES 50 Fresh water supply from MCGM
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 50 Dispose thru STP & bal treated water thru drains
Storm Water Drains : YES 100 Rain water downtake to rainwater harvesting tank
Landscaping & Tree Planting : YES 0 Proposed ground floor and podium top
Street Lighting : YES 60 lighting designed as per Authority regulation
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 50 Into STP & reused treated water disposed to drains
Solid Waste Management And Disposal : YES 18 As per waste management rules of MBMC

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 DB Ozone Building No 28 31/12/2019 2 1 1 21 1 0 80
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B28 X02 ODD 2BHK 51.25 30 28
2 B28 X05 ODD 2BHK 50.13 20 20
3 B28 X01 EVEN 1.5BHK 45.27 10 9
4 B28 X02 EVEN 2BHK 51.47 30 28
5 B28 X03 EVEN 1BHK 33.41 16 14
6 B28 X05 EVEN 2BHK 49.61 18 17
7 B28 X01 ODD 1.5BHK 44.53 10 9
8 B28 X03 ODD 1BHK 33.67 20 17
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

30
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 64
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 DB Ozone Building No 1 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B1 X01 ODD 1.5BHK 45.23 10 10
2 B1 X02 ODD 2BHK 52.06 30 30
3 B1 X03 ODD 1BHK 33.41 40 40
4 B1 X01 EVEN 1.5BHK 45.38 9 9
5 B1 X02 EVEN 2BHK 51.74 27 27
6 B1 X03 EVEN 1BHK 33.59 30 30
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 DB Ozone Building No 2 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B2 X02 EVEN 2BHK 51.74 27 27
2 B2 X03 EVEN 1BHK 33.59 30 29
3 B2 X03 ODD 1BHK 33.41 40 40
4 B2 X01 ODD 1.5BHK 45.23 10 9
5 B2 X02 ODD 2BHK 52.06 30 30
6 B X01 EVEN 1.5BHK 45.38 9 9
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 DB Ozone Building No 3 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B3 X01 ODD 1.5BHK 45.23 10 9
2 B3 X02 ODD 2BHK 52.06 30 30
3 B3 X01 EVEN 1.5BHK 45.38 9 9
4 B3 X02 EVEN 2BHK 51.74 27 27
5 B3 X03 EVEN 1BHK 33.59 30 30
6 B3 X03 ODD 1BHK 33.41 40 39
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 99.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 DB Ozone Building No 4 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B4 X01 ODD 1.5BHK 45.23 10 10
2 B4 X03 EVEN 1BHK 33.59 30 30
3 B4 X01 EVEN 1.5BHK 45.38 9 9
4 B4 X02 EVEN 2BHK 51.74 27 27
5 B4 X02 ODD 2BHK 52.06 30 30
6 B4 X03 ODD 1BHK 33.41 40 40
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 97
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 99.7
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 DB Ozone Building No 7 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B7 X01 ODD 1.5BHK 45.23 10 9
2 B7 XO2 ODD 2BHK 52.06 30 30
3 B7 X02 EVEN 2BHK 51.74 27 27
4 B7 X03 EVEN 1BHK 33.59 30 30
5 B7 X03 ODD 1BHK 33.41 40 40
6 B7 X01 EVEN 1.5BHK 45.38 9 9
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 78
11 Overall Percentage of Completion of the work done For the entire Building /Wing 91.3
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 DB Ozone Building No 8 31/12/2019 2 1 1 21 1 0 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B8 X01 ODD 1.5BHK 45.45 10 10
2 B8 X02 ODD 2BHK 51.85 10 10
3 B8 X03 ODD 1BHK 33.41 40 40
4 B8 X01 EVEN 1.5BHK 45.45 10 9
5 B8 X02 EVEN 2BHK 51.85 10 10
6 B8 X03 EVEN 1BHK 33.68 36 36
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 78
11 Overall Percentage of Completion of the work done For the entire Building /Wing 92.8
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
8 DB Ozone Building No 6 31/12/2019 2 1 1 22 1 0 85
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B6 X01 ODD 2BHK 51.62 33 30
2 B6 X02 ODD 1.5BHK 44.63 11 10
3 B6 X03 ODD 2BHK 49.30 22 20
4 B6 X04 ODD 2BHK 46.35 11 10
5 B6 X01 EVEN 2BHK 51.51 30 30
6 B6 X02 EVEN 1.5BHK 45.13 10 10
7 B6 X03 EVEN 2BHK 48.90 20 20
8 B6 X04 EVEN 2BHK 45.96 8 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 13
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 78
11 Overall Percentage of Completion of the work done For the entire Building /Wing 89.1
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
9 DB Ozone Building No 9 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B9 X01 ODD 1.5BHK 45.23 10 10
2 B9 X02 ODD 2BHK 52.06 30 30
3 B9 X01 EVEN 1.5BHK 45.38 9 9
4 B9 X02 EVEN 2BHK 51.74 27 27
5 B9 X03 EVEN 1BHK 33.59 30 30
6 B9 XO3 ODD 1BHK 33.41 40 39
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 18
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 78
11 Overall Percentage of Completion of the work done For the entire Building /Wing 89.6
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
10 DB Ozone Building No 10 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B10 X01 ODD 1.5BHK 45.23 10 9
2 B10 X02 ODD 2BHK 52.06 30 30
3 B10 X01 EVEN 1.5BHK 45.38 9 9
4 B10 X02 EVEN 2BHK 51.74 27 27
5 B10 X03 EVEN 1BHK 33.59 30 30
6 B10 X03 ODD 1BHK 33.41 40 40
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 24
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 78
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
11 DB Ozone Building No 11 31/12/2019 2 1 1 22 1 0 62
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B11 X02 ODD 1BHK 33.26 22 20
2 B11 X01 EVEN 2BHK 50.85 40 36
3 B11 X02 EVEN 1BHK 33.67 16 14
4 B11 X01 ODD 2BHK 51.33 44 40
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 6
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
11 Overall Percentage of Completion of the work done For the entire Building /Wing 82.1
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
12 DB Ozone Building No 12 31/12/2019 2 1 1 22 1 0 50
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B12 X01 ODD 1BHK 34.11 22 20
2 B12 X02 ODD 1BHK 33.41 22 20
3 B12 X03 ODD 2BHK 52.15 22 20
4 B12 X01 EVEN 1BHK 34.30 20 20
5 B12 X02 EVEN 1BHK 33.41 16 16
6 B12 X03 EVEN 2BHK 51.82 20 19
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

70
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
11 Overall Percentage of Completion of the work done For the entire Building /Wing 72.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
13 DB Ozone Building No 14 31/12/2019 2 1 1 20 1 0 56
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B14 X02 ODD 1BHK 33.41 40 40
2 B14 X03 ODD 2BHK 51.99 20 18
3 B14 X01 EVEN 1BHK 33.67 48 45
4 B14 X02 EVEN 2BHK 51.49 18 18
5 B14 X01 ODD 1BHK 33.94 20 20
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

70
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 71
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
14 DB Ozone Building No 15 31/12/2019 2 1 1 22 1 0 39
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B15 X01 ODD 1BHK 33.08 22 20
2 B15 X02 ODD 1BHK 33.41 44 39
3 B15 X01 EVEN 1BHK 33.24 20 20
4 B15 X02 EVEN 1BHK 33.81 36 36
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 45
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

55
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 66.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
15 DB Ozone Building No 16 31/12/2019 2 1 1 21 1 0 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B16 X01 ODD 1BHK 33.40 40 40
2 B16 X01 EVEN 1BHK 33.41 36 35
3 B16 X02 ODD 2BHK 51.72 20 20
4 B16 X02 EVEN 2BHK 51.96 20 18
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 72
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 71.2
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
16 DB Ozone Building No 17 31/12/2019 2 1 1 20 1 0 56
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B17 X01 ODD 1BHK 33.94 20 20
2 B17 X02 ODD 1BHK 33.41 40 37
3 B17 X03 ODD 2BHK 51.99 20 18
4 B17 X01 EVEN 1BHK 33.67 48 48
5 B17 X02 EVEN 2BHK 51.49 18 17
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

70
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 72
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
17 DB Ozone Building No 18 31/12/2019 2 1 1 22 1 0 74
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B18 X02 EVEN 2BHK 48.92 20 20
2 B18 X01 ODD 1BHK 32.97 22 20
3 B18 X02 ODD 2BHK 49.58 22 20
4 B18 X03 ODD 2BHK 51.47 22 20
5 B18 X04 ODD 2BHK 48.45 11 10
6 B18 X01 EVEN 1BHK 32.77 20 20
7 B18 X03 EVEN 2BHK 51.30 20 19
8 B18 X04 EVEN 2BHK 48.88 8 7
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

80
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 72
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
18 DB Ozone Building No 20 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B20 X01 ODD 1.5BHK 45.23 10 9
2 B20 X03 ODD 1BHK 33.41 40 40
3 B20 X01 EVEN 1.5BHK 45.38 9 9
4 B20 X02 EVEN 2BHK 51.74 27 27
5 B20 X03 EVEN 1BHK 33.59 30 30
6 B20 X02 ODD 2BHK 52.06 30 30
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

45
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 66.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
19 DB Ozone Building No 21 31/12/2019 2 1 1 21 1 0 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 B21 X01 ODD 1.5BHK 45.45 10 10
2 B21 X02 ODD 2BHK 51.85 10 10
3 B21 X01 EVEN 1.5BHK 45.45 10 9
4 B21 X02 EVEN 2BHK 51.85 10 9
5 B21 X03 EVEN 1BHK 33.68 36 32
6 B21 X03 ODD 1BHK 33.41 40 39
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

45
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 66.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
20 DB Ozone Building No 22 31/12/2019 2 1 1 21 1 0 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 22 X01 ODD 1BHK 33.40 40 40
2 22 X02 ODD 2BHK 51.72 20 20
3 22 X01 EVEN 1BHK 33.41 36 35
4 22 X02 EVEN 2BHK 51.96 20 19
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

45
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 65
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
21 DB Ozone Building No 23 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 23 X01 ODD 1.5BHK 45.23 10 10
2 23 X02 ODD 2BHK 52.06 30 28
3 23 X03 ODD 1BHK 33.41 40 40
4 23 X01 EVEN 1.5BHK 45.38 9 9
5 23 X02 EVEN 2BHK 51.74 27 26
6 23 X03 EVEN 1BHK 33.59 30 30
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

45
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 64.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
22 DB Ozone Building No 24 31/12/2019 2 1 1 22 1 0 62
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 24 X01 ODD 2BHK 51.33 44 40
2 24 X02 ODD 1BHK 33.26 22 20
3 24 X01 EVEN 2BHK 50.85 40 36
4 24 X02 EVEN 1BHK 33.67 16 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

30
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
11 Overall Percentage of Completion of the work done For the entire Building /Wing 65.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
23 DB Ozone Building No 27 31/12/2019 2 1 1 22 1 0 62
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 27 X01 EVEN 2BHK 48.07 8 7
2 27 X02 EVEN 2BHK 51.62 20 19
3 27 X03 EVEN 2BHK 49.56 20 20
4 27 X01 ODD 2BHK 51.63 11 10
5 27 X02 ODD 2BHK 51.02 22 20
6 27 X03 ODD 2BHK 49.42 22 20
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 45
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 45
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 62.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
24 DB Ozone Building No 29 31/12/2019 2 1 1 20 1 0 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 29 X01 ODD 1.5BHK 45.23 10 9
2 29 X02 ODD 2BHK 52.06 30 29
3 29 X03 ODD 1BHK 33.41 40 40
4 29 X01 EVEN 1.5BHK 45.38 9 9
5 29 X02 EVEN 2BHK 51.74 27 27
6 29 X03 EVEN 1BHK 33.59 30 30
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 35
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 61
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
25 DB Ozone Building No 30 31/12/2019 2 1 1 22 1 0 85
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 30 X04 ODD 2BHK 46.35 11 10
2 30 X02 ODD 1.5BHK 44.63 11 10
3 30 X03 ODD 2BHK 49.30 22 20
4 30 X03 EVEN 2BHK 48.90 20 20
5 30 X04 EVEN 2BHK 45.96 8 8
6 30 X01 ODD 2BHK 51.62 33 29
7 30 X01 EVEN 2BHK 51.51 30 30
8 30 X02 EVEN 1.5BHK 45.13 10 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 35
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 35
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

20
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10
11 Overall Percentage of Completion of the work done For the entire Building /Wing 60

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Avinash Mhatre & Associates NA Architect
JW CONSULTANTS LLP NA Structural Engineer

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
DB Ozone State Commission Maharashtra CC No 17/877 Civil No Other 2017 Matter kept for filing reply
NA
DB Ozone State Commission Maharashtra CC No 16/885 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/1001 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/1002 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone National Consumer Dispute Redressal Commission CC No 16/1280 Civil No Suit 2016 Matter pending
NA
DB Ozone District Consumer Dispute Redressal Forum Thane CC No 16/375 Civil No Suit 2016 Matter pending
NA
DB Ozone State Commission Maharashtra CC No 16/844 Civil No Suit 2016 Matter pending
NA
DB Ozone State Commission Maharashtra CC No 16/1126 Civil No Suit 2016 Matter pending
NA
DB Ozone State Commission Maharashtra CC No 16/1218 Civil No Suit 2016 Matter pending
NA
DB Ozone City Civil Court Summary Suit No 458 of 2016 Civil No Suit 2016 Matter pending
NA
DB Ozone State Commission Maharashtra CC No 61 of 2017 Civil No Suit 2017 Matter pending
NA
DB Ozone State Commission Maharashtra CC No 234 of 2017 Civil No Suit 2017 Matter pending
NA
DB Ozone State Commission Maharashtra CC No 17/385 Civil No Suit 2017 Matter kept for filing reply
NA
DB Ozone High Court Bombay SA No 569 of 2018 Civil No Appeal 2018 Matter pending
NA
DB Ozone High Court Bombay SA L No 33558 of 2018 Civil No Appeal 2018 Matter pending
NA
DB Ozone High Court Bombay SA L No 33563 of 2018 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-17409 of 2018 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10528 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10481 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10527 Civil No Appeal 2018 Matter pending
NA
DB Ozone State Commission Consumer Complaint No 18/120 Civil No Other 2018 Matter pending
NA
DB Ozone State Commission Consumer Complaint No 18/475 Civil No Other 2018 Matter pending
NA
DB Ozone State Commission Consumer Complaint No 18/476 Civil No Other 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10479 Civil No Appeal 2018 Matter pending
NA
DB Ozone State Commission Consumer Complaint No 18/477 Civil No Other 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10982 Civil No Appeal 2019 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10988 Civil No Appeal 2019 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10983 Civil No Appeal 2019 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10973 Civil No Appeal 2019 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10479 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10480 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10397 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10745 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10529 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10774 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Appellate Tribunal Appeal No AT006-10773 Civil No Appeal 2018 Matter pending
NA
DB Ozone MahaRERA Authority Complaint No CC006-55935 Civil No Other 2018 Matter pending
NA
DB Ozone MahaRERA Authority Complaint No CC006-56524 Civil No Other 2018 Matter pending
NA
DB Ozone MahaRERA Authority Complaint No CC006-57117 Civil No Other 2018 Matter pending
NA
DB Ozone MahaRERA Authority Complaint No CC006-57460 Civil No Other 2018 Matter pending
NA
DB Ozone MahaRERA Authority Complaint No CC006-55865 Civil No Other 2018 Matter pending
NA
DB Ozone State Commission Maharashtra CC No 12/184/2012 Civil No Suit 2012 Matter pending
NA
DB Ozone City Civil Court Sr Div Thane SC Suit No 206 of 2014 Civil No Suit 2014 Matter pending
NA
DB Ozone City Civil Court Sr Div Thane SCS No 346 of 2013 Civil No Suit 2013 Matter pending
NA
DB Ozone State Commission Maharashtra CC No 647/15 Civil No Suit 2015 Matter kept for final argument
NA
DB Ozone State Commission Maharashtra CC No 16/657 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC 16/658 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/659 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/662 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/661 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/664 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/660 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/656 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/712 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/713 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/665 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/666 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/710 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/709 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 887 of 2016 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/893 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/892 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/825 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/896 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/823 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/895 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/890 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/891 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/826 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC No 16/888 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone State Commission Maharashtra CC 16/986 Civil No Suit 2016 Matter kept for evidence
NA
DB Ozone High Court Bombay 9560 of 2018 Civil No Writ Petition 2018 Matter pending for filing Withdrawal Application
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other