MahaRERA Application

General Information

Other Than Individual

Organization

ASR Promoters and Developers LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

CTS NO 927
SANAS MEMORIES
F. C. ROAD
SHIVAJI NAGAR
NR DIN DAYAL HOSPITAL
MAHARASHTRA
Pune
Pune
Haveli
Peth
411005

Organization Contact Details

02025663051
www.pebblespune.com

Past Experience Details

Member Information

Member Name Designation Photo
MUKESH MANOHAR YEOLE Partner View Photo
SACHIN POPATLAL NAHAR Partner View Photo
SHAMKANT JAGANNATH SHENDE Authorized Signatory View Photo

Project

PEBBLES URBANIA
On-Going Project
31/12/2024
30/06/2026
Yes
Others
No
S NO 2 AND OTHERS
S NO 2 AND GAVTHAN
S NO 10 PART
S NO 11 AND GAVTHAN
RAMNADI AND S NO 7 PART
MAHARASHTRA
Pune
Pune
Mulshi
Bavadhan BK
411021
39400
8
8
0
3940

FSI Details

21947
35988.75
57935.75

Bank Details

ICICI BANK LTD
ICIC0000039

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 556 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Concrete Road with Paver Footpath
Water Conservation, Rain water Harvesting : YES 100 As per Drwgs from Consultant Statutory Authority
Energy management : YES 60 Solar Water
Fire Protection And Fire Safety Requirements : YES 100 As per Drawings obtained from Consultant Fire Dept
Electrical Meter Room, Sub-Station, Receiving Station : YES 15 As per Drawings obtained from Consultant MSEDCL
Amphitheatre : YES 0 As per Drawings obtained from Consultant
Aroma Herb Garden : YES 0 As per Drawings obtained from Consultant
Childrens Play Area : YES 100 As per Drawings obtained from Consultant
Club House with Gymnasium Indoor games Multipurpose hall : YES 100 As per Drawings obtained from Consultant
Cycling Track : YES 100 As per Drawings obtained from Consultant
Health Tree Courts : YES 0 As per Drawings obtained from Consultant
Multipurpose Court : YES 0 As per Drawings obtained from Consultant
Outdoor exercise staion : YES 100 As per Drawings obtained from Consultant
Party Lawn : YES 100 As per Drawings obtained from Consultant
Piped Gas : YES 80 As per Drawings obtained from Consultant
Senior Citizens Plaza : YES 80 As per Drawings obtained from Consultant
Skating Rink : YES 100 As per Drawings obtained from Consultant
Spiritual Centre : YES 0 As per Drawings obtained from Consultant
Swimming Pool : YES 80 As per Drawings obtained from Consultant
Theme Planted Avenues : YES 0 As per Drawings obtained from Consultant
Walking Track : YES 100 As per Drawings obtained from Consultant
Yoga court : YES 0 As per Drawings obtained from Consultant
Aggregate area of recreational Open Space : YES 0 As per Drwgs from Consultant Statutory Authority
Open Parking : YES 0 As per Drawings obtained from Consultant
Water Supply : YES 80 Borewell Tanker Grampanchayat Recycled Water
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 As per Drwgs from Consultant Statutory Authority
Storm Water Drains : YES 100 As per Drwgs from Consultant Statutory Authority
Landscaping & Tree Planting : YES 10 As per Drawings obtained from Consultant
Street Lighting : YES 100 As per Drawings obtained from Consultant
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 As per Drwgs from Consultant Statutory Authority
Solid Waste Management And Disposal : YES 100 As per Drwgs from Consultant Statutory Authority

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 PEBBLES URBANIA A BUILDING 31/12/2025 0 1 1 12 1 24 72
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 55.67 24 24
2 2BHK 52.21 24 24
3 2BHK 52.20 24 24
4 2BHK 55.90 24 24
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 PEBBLES URBANIA B BUILDING 31/12/2025 0 1 1 12 1 10 86
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 56.4 24 24
2 2BHK 56.55 23 23
3 2BHK 56.3 1 1
4 3BHK 70.34 47 47
5 3BHK 61.76 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 PEBBLES URBANIA C BUILDING 31/12/2025 0 1 1 12 1 26 114
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 53.75 36 36
2 2BHK 53.79 12 12
3 3BHK 56.82 12 12
4 3BHK 59.71 12 12
5 3BHK 60.52 12 12
6 3BHK 67.46 48 48
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 PEBBLES URBANIA D BUILDING 31/12/2025 0 1 1 12 1 80 87
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 33.23 95 95
2 2BHK 46.89 24 24
3 2BHK 48.64 24 24
4 2BHK 47.43 24 24
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 PEBBLES URBANIA E Building 31/12/2025 0 1 1 12 1 03 95
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 53.25 36 33
2 2BHK 53.11 11 09
3 2BHK 48.77 01 00
4 3BHK 66.53 47 25
5 3BHK 66.22 01 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

50
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 PEBBLES URBANIA G BUILDING 0 1 1 7 1 5 6
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 G1BLK01 27.85 14 0
2 G1BLK02 27.94 14 0
3 G1BLK03 30.76 14 0
4 G1BLK04 31.89 7 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 PEBBLES URBANIA H BUILDING 0 1 0 2 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 ROWHOUSE 126.59 06 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 50
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
8 PEBBLES URBANIA F BUILDING 31/12/2022 0 01 01 05 01 30 65
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 47.78 02 00
2 2BHK 51.13 02 00
3 2BHK 51.43 02 00
4 2BHK 55.49 02 00
5 2BHK 55.60 02 00
6 2BHK 55.71 02 00
7 2BHK 55.72 04 01
8 2BHK 55.81 02 00
9 2BHK 55.88 18 01
10 2BHK 55.94 04 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 30
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 15
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 44.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
G A BHILARE MS G A BHILARE CONSULTANT PVT LTD NA Engineer
SEEMA GOHAD GOHAD ARCHITECTS NA Architect
SUSHMA CHAVAN SIDDHIVINAYAK MEP CONSULTANT NA Other Professional
VIKAS LABBA DESIGN TERRA LANDSCAPE CONSULTANT NA Other Professional
NIRMITEE CONSTRUCTION NA Contractor
SHEKHAR NAHAR ARCON ASSOCIATES NA Architect
SHRIRAM CONSTRUCTION NA Contractor

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
PEBBLES URBANIA CIVIL JUDGE SENIOR DIVISION PUNE 299 Civil No Suit 2017 FILING OF WRITTEN STATEMENT
NA
PEBBLES URBANIA S D O MAVAL 390 Others No Appeal 2014 APPEARANCE OF RESPONDENTS
NA
PEBBLES URBANIA S D O MAVAL 394 Others No Appeal 2014 APPEARANCE OF RESPONDENTS
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other