MahaRERA Application

General Information

Other Than Individual

Organization

NIRMITI DEVELOPERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

4046
JADHAV COMPLEX
NAVI PETH ROAD
NAVI PETH
NEAR SHAH PETROL PUMP
MAHARASHTRA
Pune
Solapur
Pandharpur
PANDHARPUR
413304

Organization Contact Details

02186224363

Past Experience Details

Member Information

Member Name Designation Photo
VINOD SHRIRANG JADHAV Partner View Photo
SIDDHARTH DATTATRAY JACHAK Partner View Photo
PRAMOD PRAKASH THITE Authorized Signatory View Photo

Project

NIRMITI ARMAAN
On-Going Project
27/09/2018
30/05/2020
No
Others
Yes
4629
4628 A1 A3
4631 A
ROAD
ROAD
MAHARASHTRA
Pune
Solapur
Pandharpur
PANDHARPUR
413304
1858.63
2
2
0
00

FSI Details

0
2230.19
2230.19

Bank Details

CORPORATION BANK
CORP0001815

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
NIRMITI ARMAAN SHAMIM TASDIQHUSAIN RAJA Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 26 1 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 ONLY RAIN WATER HARVESTING
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 AS PER MSEDCL RULES
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 50 BORE WELL
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 AS PER NAGARPARISHAD PROVISION
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 NIRMITI ARMAAN NIRMITI ARMAAN WING A 1 1 0 5 1 0 14
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 90.42 6 0
2 2BHK 55.38 6 0
3 SHOP 19.52 2 0
4 SHOP 23.04 1 0
5 SHOP 8.78 1 0
6 3BHK 97.61 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 53
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 NIRMITI ARMAAN NIRMITI ARMAAN WING B 1 1 0 5 1 0 12
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 8.78 1 0
2 SHOP 19.52 4 0
3 2BHK 55.38 12 1
4 SHOP 23.02 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 30
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 53

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SIDHESHWAR NANAWARE NA Contractor
CHANDRASHEKHAR PAWAR NA Architect
RAMDAS JAGATAP NA Structural Engineer
DEVIDAS B KAWALE NA
PRAMOD P THITE NA

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other