MahaRERA Application

General Information

Individual

Individual

Tushar
Mohanrao
Khatavkar
Mr Mohanrao Sopanrao Khatavkar
Yes

Address For Official Communication

377 1-5 A Wing 111-112
Mandlik Park
Rajarampuri 13th Lane
Opp Pre IAS Training Center
Opp Pre IAS Training Center
MAHARASHTRA
Pune
Kolhapur
Karvir
Kolhapur (M Corp.)
416008

Contact Details

08793666444

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Tulip Anandi krishna ResidencyResidentialNA600302 A-4 E Ward samarat Nagar Kolhapur302 A-41122017-01-312017-04-28
2Tulip VishwalaxmiOthersCommercial and Residential117.9558-A Shahupuri Vyaparipeth kolhapur558-A192016-09-302016-12-31

Project

TULIP GREEN
On-Going Project
31/07/2018
31/12/2018
No
Others
No
1182-39
Road
Road
C S No 1182-38
C S No 1182-42
MAHARASHTRA
Pune
Kolhapur
Karvir
Kolhapur (M Corp.)
416008
297.3
1
1
0
0

FSI Details

0
609.13
609.13

Bank Details

ICICI Bank Ltd
ICIC0000166

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 6 0 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 -
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 -
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 100 -
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 KMC drainage Line
Storm Water Drains : YES 100 -
Landscaping & Tree Planting : YES 60 -
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 TULIP GREEN Tulip Green 31/12/2018 1 1 0 5 1 0 6
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Godown No.1 14.61 1 1
2 Godown No.2 17.13 1 1
3 Godown No.3 30.14 1 0
4 Godown No.4 28.20 1 1
5 Shop No.1 16.17 1 1
6 Shop No.2 10.02 1 1
7 showroom No.1 51.30 1 0
8 office No.101 23.28 1 1
9 office No.102 30.11 1 0
10 Flat No 103 47.72 1 1
11 Flat No. 201 62.35 1 1
12 Flat No 202 53.88 1 1
13 Flat No.301 62.67 1 1
14 Flat No.302 54.18 1 1
15 Flat No.401 62.35 1 1
16 Flat No. 402 73.53 1 1
17 Flat No.501 54.33 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 89

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Mr Rahul shivaji Sasane NA Architect
Mr Mahesh kumbhojkar NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Proforma of the allotment letter and agreement for sale
Declaration in FORM B
Commencement Certificates
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Other
Other
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Status of Conveyance
Certificates of Architect (Form 4)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Formation of Legal Entity (Society/Co Op etc.)
Certificates of Architect (Form 4)
Other