MahaRERA Application

General Information

Individual

Individual

PARASHRAM
KAMANNA
REMANICHE
KAMMANA YALLAPA REMANICHE
No

Address For Official Communication

54
KAMAL NIVAS
VARSHANAGAR
VARSHANAGAR
SSC BOARD
MAHARASHTRA
Pune
Kolhapur
Karvir
Kolhapur (M Corp.)
416012

Contact Details

08080177117

Past Experience Details

Project

SHRIPAD HEIGHTS
On-Going Project
31/07/2020
31/10/2020
No
Others
No
8/1B PLOT NO 2 AND 8/1B 8/1/A PLOT NO 3
OPEN SPACE
18 M ROAD
PLOT NO 4
9 M ROAD
MAHARASHTRA
Pune
Kolhapur
Karvir
Kandgaon
410008
936
1
1
0
0

FSI Details

35.35
1309.38
1344.73

Bank Details

UNION BANK OF INDIA
UBIN0545155

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 5 0 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 AS PER DRAWING
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 AS PER DRAWING
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 50 Bore water & Drinking yet to be provided by KMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 AS PERDRAWING
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SHRIPAD HEIGHTS SHRIPAD HEIGHTS 1 1 0 4 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL AND COMM 1133.70 32 17
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 04
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 10
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 20
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 23.4

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
PRAVIN PATIL NA Architect
JAYSINH DESHMUKH NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other