MahaRERA Application

General Information

Other Than Individual

Organization

S N POTE CONSTRUCTION CO
Partnership
NA
Do you have any Past Experience ?
Yes

Address Details

GP 85
POTE CHAMBER
SAMBHAJINAGAR
CHINCHWAD
G BLOCK MIDC
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
411019

Organization Contact Details

07350381546
snpoteconstructionco.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1POTE DREAMSResidentialNA871.87 SECTION 18 PRADHIKARAN CHINCHWAD PUNE117/112142015-06-242016-12-01

Member Information

Member Name Designation Photo
NAMDEO SHANKAR POTE Authorized Signatory View Photo
SHASHIKALA NAMDEO POTE Partner View Photo

Project

KINJAL PRISTINE
On-Going Project
30/11/2021
30/11/2021
No
Residential
No
GAT NO 71 3/4/1 AND GAT NO 71 3/5 PART
MAHADHU BHANGARE
RAMDAS TARAS
18M DP ROAD
GULAB TARAS
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
Kiwale
Kiwale
412101
4300
2
2
0
0

FSI Details

1466.9
4868
6334.90

Bank Details

TJSB BANK
TJSB0000044

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 49 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 No Work Done
Water Conservation, Rain water Harvesting : NO 0 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 64 AT THE TIME COMPLETION
Water Supply : YES 0 PROVIDED BY PCMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 No Work Done
Storm Water Drains : YES 0 No work done
Landscaping & Tree Planting : YES 0 No Work Done
Street Lighting : YES 0 No Work Done
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 KINJAL PRISTINE A WING 0 1 0 5 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 FLAT 31.87 16 0
2 FLAT 49.45 2 0
3 FLAT 49.56 6 0
4 FLAT 49.72 4 0
5 FLAT 49.83 4 0
6 SHOP 22.09 1 0
7 SHOP 14.85 2 0
8 SHOP 20.99 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 KINJAL PRISTINE B WING 30/11/2021 0 1 0 7 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 49.45 2 2
2 2 BHK 49.72 6 1
3 2 BHK 49.56 15 5
4 2 BHK 49.83 8 5
5 1 BHK 31.87 31 17
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 50
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

75
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 25
11 Overall Percentage of Completion of the work done For the entire Building /Wing 69

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SWAPNIL SHETH NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other