MahaRERA Application

General Information

Other Than Individual

Organization

West Avenue Realtors Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

UNIT NO. 1201
PENINSULA BUSINESS PARK, B TOWER
GANPATRAO KADAM MARG
LOWER PAREL
OPP. URMI ESTATE
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400013
400013

Organization Contact Details

02240836666
www.jadeindia.com

Past Experience Details

Member Information

Member Name Designation Photo
Ramakant Ramchandra Jadhav Authorized Signatory View Photo
Prakash Vasant Ajgaonkar Authorized Signatory View Photo

Project

Deluxe Apartments
On-Going Project
30/10/2020
30/10/2020
No
Residential
No
Final Plot No. 66/5
By government land bearing Survey No 355
by sub plot No 6 of Final plot No 66
By sub plot No 4 of Final plot 66
by 3rd road of the scheme
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
3rd Road
Santacruz E
400055
1162.20
1
1
0
175.76

FSI Details

1245.96
1891.96
3137.92

Bank Details

Bassein Catholic Co-op Bank Ltd
BACB0000052

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 71 2 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 to be installed
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 to be installed
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 to be installed
2 Car lifts : YES 0 to be installed
2 elevators : YES 0 to be installed
CCTV cameras in common areas : YES 0 to be installed
DG set : YES 0 to be installed
fully equipped gymnasium : YES 0 to be installed
Stack car parking system : YES 0 to be installed
Aggregate area of recreational Open Space : YES 0 to be constructed
Open Parking : NO 0 NA
Water Supply : YES 0 To be applied
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 to be constructed
Storm Water Drains : YES 0 to be constructed
Landscaping & Tree Planting : YES 0 to be planted
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 0 to be installed

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Deluxe Apartments Deluxe Apartment 1 1 2 13 1 0 71
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2andhalfBHKRehab 72.37 4 4
2 2andhalfBHKRehab 74.02 4 4
3 3BHKRehab 79.29 5 5
4 3BHKRehab 77.46 3 3
5 3BHKRehab 79.77 1 1
6 2BHKRehab 66.62 1 1
7 2BHKSale 65.97 1 0
8 2BHKSale 66.61 2 0
9 2BHKSale 67.09 1 0
10 2BHKSale 66.62 4 0
11 2BHKSale 59.15 1 0
12 2BHKSale 57.31 1 0
13 3BHKSale 77.14 1 0
14 3BHKSale 77.46 5 0
15 3BHKSale 79.29 3 1
16 2andhalfBHKSale 74.02 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 30

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Satish Palav NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other