MahaRERA Application

General Information

Individual

Individual

Vilas
Tukaram
Wadghule
Tukaram Shankar Wadghule
No

Address For Official Communication

Muktai Niwas 1
Muktai Niwas
Shikrapur Talegaon Road
Shikrapur
Karanje Nagar
MAHARASHTRA
Pune
Pune
Shirur
Shikrapur
412208

Contact Details

02027012525
www.shreeramdeveloper.org

Past Experience Details

Project

Sai Shawas
On-Going Project
26/12/2021
26/06/2022
No
Residential
No
53
53P
Village Road
53P
53P
MAHARASHTRA
Pune
Pune
Haveli
Wade Bolhai
412207
8000.00
3
3
0
776.8

FSI Details

1200.00
8234.84
9434.84

Bank Details

Bank of Maharastra
MAHB0001874

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 60 10 95
Covered Parking ( In Numbers) 80 22 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 50 To Be Constructred
Water Conservation, Rain water Harvesting : YES 100 To be Done
Energy management : YES 100 To Be Done
Fire Protection And Fire Safety Requirements : YES 100 To Be Done
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 To Be Done
Aggregate area of recreational Open Space : YES 0 To Be Constructred
Open Parking : YES 0 To Be Constructred
Water Supply : YES 100 Bore well
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 To Be Done
Storm Water Drains : YES 100 To Be Done
Landscaping & Tree Planting : YES 50 To Be Done
Street Lighting : YES 50 To Be Constructred
Community Buildings : YES 0 To Be Constructred
Treatment And Disposal Of Sewage And Sullage Water : YES 100 To Be Done
Solid Waste Management And Disposal : YES 0 To Be Constructred

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Sai Shawas WING A 0 1 0 8 0 0 28
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Residential 31.83 28 0
2 Residential 47.94 28 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 50
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Sai Shawas Wing B 0 1 0 8 0 0 28
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Residential 31.83 28 0
2 Residential 47.94 28 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
11 Overall Percentage of Completion of the work done For the entire Building /Wing 79.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 Sai Shawas Wing C 0 1 0 7 0 0 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Residential 31.83 24 0
2 Residential 47.94 24 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 7
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20.7

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Mr Vishwanath Jagtap NA Architect
Mr Annirudha Vanarse NA Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other